Chapter 4
4-23
F-4-77
4.3.1.8
Removing the
Processing Tray
0004-4586
1) Unfasten four snap fasteners [1] and remove the
sensor flag [3] from the stack delivery roller [2].
Hold the snap fastener at the base when
unfastening because the sensor flag arm can break
easily. When fastening, insert the boss of the sensor
flag snap fastener in the hole on the processing tray
side.
F-4-78
2) Remove the stack delivery roller front side E ring
[4], gear [5], parallel pin [6], E ring [7], and bushing
[8].
The parallel pin [6] drops when the gear [5] is
removed. Be careful not to loose it.
F-4-79
3) Remove all finisher controller PCB connectors[9].
4) Remove four screws [10]. Remove the screw [11]
securing the ground wire and remove the finisher
controller PCB [12].
F-4-80
5) Release the claw [13] of the stack delivery roller
rear side clutch [12] and remove the clutch [12].
6) Remove the E ring [14] and bushing [15] and
remove the stack delivery roller.
[1]
[1]
[1]
[2]
Summary of Contents for Finisher-R1
Page 1: ...Nov 27 2003 Service Manual Finisher Sorter DeliveryTray Finisher R1 ...
Page 2: ......
Page 6: ......
Page 10: ......
Page 11: ...Chapter 1 Specifications ...
Page 12: ......
Page 14: ......
Page 21: ...Chapter 2 Functions ...
Page 22: ......
Page 24: ......
Page 49: ...Chapter 3 Installation ...
Page 50: ......
Page 52: ......
Page 69: ...Chapter 3 3 17 F 3 41 1mm 1mm 1 1 2 2 3 ...
Page 70: ......
Page 71: ...Chapter 4 Parts Replacement Procedure ...
Page 72: ......
Page 85: ...Chapter 4 4 10 F 4 35 1 1 1 2 ...
Page 129: ......
Page 130: ...Chapter 5 Maintenance ...
Page 131: ......
Page 133: ......
Page 160: ...Chapter 5 5 27 4 Mount the rear cover to the Finisher 5 Turn on the power of the host machine ...
Page 162: ...Chapter 6 Error Code ...
Page 163: ......
Page 165: ......
Page 175: ......
Page 176: ...Nov 27 2003 ...
Page 177: ......