Chapter 4
4-44
F-4-154
5) Release the claw [13] of the stack delivery roller
rear side clutch [12] and remove the clutch [12].
6) Remove the E ring [14] and bushing [15] and
remove the stack delivery roller.
F-4-155
7) Disconnect the connector [16] and remove harness
from the clamp and edge saddle [17].
8) Remove two screws [18] and pull out the
processing tray [19] in the paper delivery direction.
When removing parts inside the processing tray,
be careful not to exert force on the aligning plate
(front/rear) or the rear end stopper plate.
F-4-156
4.3.6.10
Removing the Swing
Unit
0004-4673
1) Remove screw [1] and pull up the swing pressure
guide [2].
F-4-157
2) Remove two E rings [3] at the joint between the
swing unit and the return roller unit and then slide the
two return roller unit collars [4] inside.
3) Unhook the swing pressure rack [5] from the swing
unit center hook.
4) Remove the belt on the gear [6] at the rear side of
the swing unit and then pull out the swing unit [7]
from the delivery direction.
The parallel pin [8] drops when the gear [6] is
removed. Be coreful not to loose it.
Summary of Contents for Finisher-R1
Page 1: ...Nov 27 2003 Service Manual Finisher Sorter DeliveryTray Finisher R1 ...
Page 2: ......
Page 6: ......
Page 10: ......
Page 11: ...Chapter 1 Specifications ...
Page 12: ......
Page 14: ......
Page 21: ...Chapter 2 Functions ...
Page 22: ......
Page 24: ......
Page 49: ...Chapter 3 Installation ...
Page 50: ......
Page 52: ......
Page 69: ...Chapter 3 3 17 F 3 41 1mm 1mm 1 1 2 2 3 ...
Page 70: ......
Page 71: ...Chapter 4 Parts Replacement Procedure ...
Page 72: ......
Page 85: ...Chapter 4 4 10 F 4 35 1 1 1 2 ...
Page 129: ......
Page 130: ...Chapter 5 Maintenance ...
Page 131: ......
Page 133: ......
Page 160: ...Chapter 5 5 27 4 Mount the rear cover to the Finisher 5 Turn on the power of the host machine ...
Page 162: ...Chapter 6 Error Code ...
Page 163: ......
Page 165: ......
Page 175: ......
Page 176: ...Nov 27 2003 ...
Page 177: ......