78
TE-BBR Instruction and Operation Manual
2.
On a lab table or bench, place two 16" high boxes or two 16" high stacks of books approximately 8"
apart.
3.
Carefully lift the Load Frame out of the TE-BBR bath. While maintaining the Load Frame in its vertical
position, transfer it to the table and orient so that the Load Frame is suspended in its vertical
position on the 16" supports. Refer to Figure 34. Clean and dry the Frame.
Figure 34: Supported Load Frame
4.
Using the stubby flat blade screwdriver, remove the four screws/washers securing the twin beam
supports to the base of the Load Frame. The screws are located on the underside of the Load Frame.
Refer to Figure 35.
Figure 35: Load Frame Supports
5.
Set the screws/washers removed in Step 3 aside. Remove the old beam supports from the Load
Frame.
Summary of Contents for TE-BBR
Page 1: ...Instruction Operation Manual 44 0991 Thermo Electric Bending Beam Rheometer TE BBR ...
Page 2: ......
Page 10: ......
Page 11: ......
Page 44: ...CANNON Instrument Company Software Menu Options 33 Figure 17 Toolbar Options ...
Page 47: ...36 TE BBR Instruction and Operation Manual Figure 18 Mold Specimen Diagram ...
Page 70: ...CANNON Instrument Company Troubleshooting 59 Figure 25 Diagram A new Figure 26 Diagram B old ...
Page 85: ...74 TE BBR Instruction and Operation Manual Figure 31 Graph View ...