![Cannon TE-BBR Instruction & Operation Manual Download Page 54](http://html1.mh-extra.com/html/cannon/te-bbr/te-bbr_instruction-and-operation-manual_493056054.webp)
CANNON Instrument Company | Test Asphalt Binder Samples
43
To make additional tests, simply repeat this procedure and make changes as desired using the menu
options.
Test Description
The full load will initially be applied to the sample for a one-second period, and then removed for
twenty seconds before it is again applied for the full 240 second test period. The short pre-loading
ensures that the beam is well seated on the supports before the actual test begins. Since some slight
deformation will occur, the twenty-second unloading period allows the beam to recover to the
original state.
The progress of the test can be observed by following the graph plot of load and deflection
appearing on the computer monitor. At the end of the loading period, there is an automatic return
to zero load condition and the graph plot is redrawn with revised vertical axis scale values if the BBR
Autoscaling feature is enabled. Refer to Figure 21 for an example of a test graph.
Figure 19: Graph of Test Results
Results also appear in Report form. Figure 22 is an example of test results in Report view. See
Appendix 1 – Test Reports for more information about test results.
Summary of Contents for TE-BBR
Page 1: ...Instruction Operation Manual 44 0991 Thermo Electric Bending Beam Rheometer TE BBR ...
Page 2: ......
Page 10: ......
Page 11: ......
Page 44: ...CANNON Instrument Company Software Menu Options 33 Figure 17 Toolbar Options ...
Page 47: ...36 TE BBR Instruction and Operation Manual Figure 18 Mold Specimen Diagram ...
Page 70: ...CANNON Instrument Company Troubleshooting 59 Figure 25 Diagram A new Figure 26 Diagram B old ...
Page 85: ...74 TE BBR Instruction and Operation Manual Figure 31 Graph View ...