4.  Locate boiler at least ten feet from building air intake. 

 

5.  Avoid installation in areas where runoff from adjacent building can spill onto boiler. 

 

7.2 

 SIDEWALL VENTING  

 

When fitted with the factory supplied vent terminal, the MicoFlame series 2 can vent up to 60 
equivalent feet. Elbows can range from 8 to 15 feet in equivalent length depending on centreline 
radius. See Table 1 for vent sizes. 
 
Boilers may be installed with either a horizontal sidewall vent or vertical roof top terminal. 
Terminals differ with each application. Horizontal lengths over 5 feet must be installed using 
corrosion resistant stainless steel. Use single wall vent and seal all joints or use pressure rated 
double wall vent. 
 
Refer to local codes for proper installation and location of vent terminals. 
 
When using sidewall vent, all vent connector seams and joints must be sealed with pressure 
sensitive aluminium tape or silicone sealant as specified by the vent manufacturer. Aluminium 
tape must meet the provisions of SMACNA AFTS-100-73 Standard. 
 
When venting through unheated spaces with single wall vent, insulation should be wrapped 
around the vent pipe to prevent flue gas condensation inside the vent. 
 
Periodically check to ensure that the vent terminal is unobstructed. 
 

7.3 

 OUTDOOR AIR KIT  

 
When fitted with the factory supplied air inlet ring and air intake terminal, the MicoFlame series 2 
can draw outdoor air over an equivalent length of 60 feet. See Table 1 for vent sizes. 
 
Boilers may be installed with either a horizontal sidewall vent or vertical roof top terminal. 
Terminals differ with each application. 
 
The following applies to outdoor air installations: 
 

1.  Use only factory supplied air intake terminal. 

 

2.  Periodically check to ensure that air intake is not obstructed. 

 

3.  Refer to local codes for proper installation and location of vent terminals. Vertical vent 

terminal must be at least 3 feet above the highest point where it is located above the roof 
of a building and at least two feet higher than any part of the building within a horizontal 
distance of ten feet 

 

4.  Locate the air intake five feet away from the vent discharge. For sidewall venting locate 

the air intake below the vent outlet if possible. 

Summary of Contents for MICOFLAME 2 Series

Page 1: ...r appliance WHAT TO DO IF YOU SMELL GAS o Do not try to light any appliance o Do not touch any electrical switch do not use any phone in your building o Immediately call your gas supplier from a neigh...

Page 2: ...8 RELIEF VALVE 10 9 FREEZE PROTECTION 10 10 WARNING REGARDING CHILLED WATER SYSTEMS 11 11 PIPING OF SYSTEM TO BOILER FIG 4 11 12 PLACING BOILER IN OPERATION 13 13 IGNITION SYSTEM SAFETY SHUT OFF DEVI...

Page 3: ...ty having jurisdiction the installation must conform to the Standard for Controls and Safety Devices for Automatically Fired Boilers ANSI ASME CSD 1 The qualified installer shall instruct the end user...

Page 4: ...installed above the level of the building s radiation system a low water cutoff device must be installed in the boiler outlet at the time of installation Some local codes require the installation of a...

Page 5: ...tion leading to reversal of the natural draft action of the venting system Under these circumstances an engineered air supply is necessary If the heater is to be installed near a corrosive or potentia...

Page 6: ...fans must be running in order for the appliance to proceed to trial for ignition MicoFlame series 2 is supplied with more than one burner may use burners that are not of identical size in order to acc...

Page 7: ...to operate at inlet gas pressures not exceeding PSI 14 W C If higher pressures are present consult the gas company for correction When pressure testing the gas supply piping at pressures above PSI th...

Page 8: ...upported approximately every 4 feet to prevent sagging and maintain a minimum upward slope of per foot from the boiler to the vent terminal When an existing boiler is removed from a common venting sys...

Page 9: ...structions from the chimney and flue which might impede draft action Replace any damaged or deteriorated parts of the venting system A qualified service technician should follow this procedure when in...

Page 10: ...efficient and is considered to be a category II or IV appliance Three venting options are available for this boiler in both condensing and non condensing configurations See Figure 2 for details Pleas...

Page 11: ...ACNA AFTS 100 73 Standard When venting through unheated spaces with single wall vent insulation should be wrapped around the vent pipe to prevent flue gas condensation inside the vent Periodically che...

Page 12: ...inst damage that could be caused by malfunctioning controls or excessive water pressure If a relief valve is not used warranty is void The relief valve is to be located as near as practical to the out...

Page 13: ...tic means to prevent gravity circulation of chilled water through the boiler Chilled water in the boiler will create condensate on the boiler tubes which will collect in the combustion chamber causing...

Page 14: ...radiation level it must be provided with a low water cutoff device at the time of boiler installation Available from factory A pressure relief valve is supplied with each MicoFlame series 2 boiler Th...

Page 15: ...ance filled with air Start up boiler following instructions provided Operate entire system including pumps and radiation for at least 1 hour Check water level in expansion tank If level exceeds of tan...

Page 16: ...he inlet temperature is greater than 110 F but not greater than 140 F no further adjustment is required e Check the inlet temperature after 5 minutes and make final adjustments 15 INSTANTANEOUS WATER...

Page 17: ...t burner every six months for proper flame characteristics 16 1 MAIN BURNER The main burner figure 7 should display the following characteristics Acceptable CO and CO2 levels for complete combustion L...

Page 18: ...1 6 1 9 1 6 1 9 1 2 1 6 1 2 1 6 2000 1 9 2 2 1 9 2 2 1 5 1 9 1 5 1 9 Depending on field conditions air box pressures will have to be adjusted accordingly Always set the appliance for a CO2 level in th...

Page 19: ...e electrode does not appear overheated or fouled with carbon It may be necessary to clean the ignition electrode using steel wool Once the pilot appears to be properly set reinstall it into the applia...

Page 20: ...ction 15 of this manual After the first season of operation inspect the heat exchanger and venting Follow the detailed instructions in section 6 of this manual CAUTION Label all wires prior to disconn...

Page 21: ...If pilot fails to light and you suspect air in the line close the main manual valve and repeat lighting steps 1 thru 5 7 Once the pilot lights it should envelope the ignition rod and ground electrode...

Page 22: ...und electrodes are positioned properly Clean with steel wool if necessary Verify that back of burner box is fully engaged into the retaining slot in the combustion chamber base 5 Pilot lights but main...

Page 23: ...ICAL DIAGRAMS Each MicoFlame series 2 boiler will be provided with its own wiring diagram to guarantee that any options ordered with the unit are properly detailed The following diagram 99 5072 and 99...

Page 24: ...22...

Page 25: ...23...

Page 26: ...24 22 EXPLODED VIEW...

Page 27: ...25 23 MICO FLAME REPLACEMENT PARTS LIST...

Page 28: ...standard warranty 2 Years six through ten replacement purchase price pro rated at the following schedule Year six 60 Year seven 65 Year eight 70 Year nine 75 Year ten 80 of the current list price of t...

Page 29: ...t water heaters and heating boilers as well as a into every single unit For more information supplier of specialty HVAC products Our service line is open 24 hours 7 days a week on our innovative produ...

Reviews: