CONNECTING THE CYLINDER
Clearance to LP containers: 10 feet (3M)
IF CYLINDERS ARE USED TO SUPPLY THE HEATER, NO CYLINDERS SMALLER THAN 100
LB CAPACITY SHALL BE USED. THESE CYLINDERS MUST SUPPLY A VAPOUR
WITHDRAWAL ONLY.
1.) ALL CYLINDER CONNECTIONS MUST BE MADE USING A WRENCH TO TIGHTEN THE
POL FITTING.
2.) BE SURE THAT THE CYLINDER VALVE IS IN THE CLOSED POSITION WHEN
CONNECTING OR DISCONNECTING THE CYLINDER.
3.) PROPER PROCEDURE FOR GAS LEAK TESTING: A SOAP AND WATER SOLUTION
MUST BE APPLIED TO ALL CONNECTIONS IN ORDER TO LEAK CHECK THE SYSTEM.
4.) THE HOSE ASSEMBLY MUST BE VISUALLY INSPECTED PRIOR TO EACH USE OF
THE HEATER.
THE GAS MUST BE TURNED OFF AT THE PROPANE SUPPLY CYLINDER(S) WHEN THE
HEATER IS NOT IN USE. WHEN THE HEATER IS TO BE STORED INDOORS, THE
CONNECTION BETWEEN THE PROPANE SUPPLY CYLINDER(S) AND THE HEATER MUST
BE DISCONNECTED AND THE CYLINDERS REMOVED FROM THE HEATER AND STORED IN
ACCORDANCE WITH STANDARDS FOR THE STORAGE AND HANDLING OF LIQUIFIED
PETROLEUM GASES, ANSI/NFPA 58 AND CSA B149.1, NATURAL GAS AND PROPANE
INSTALLATION CODE.
PIPING:
THIS HEATER MUST BE INSTALLED BY A QUALIFIED GAS TECHNICIAN
FOLLOWING LOCAL CODES PUBLISHED BY THE AUTHORITY HAVING JURISDICTION.
SIZING OF SUPPLY PIPING MUST BE DETERMINED USING THE LENGTH OF PIPE RUN AS
WELL AS TOTAL BTUH RATING OF THE APPLIANCE(S). APPROPRIATE PIPING TABLES
MUST BE USED TO DETERMINE SIZE OF SUPPLY PIPING DEPENDANT ON THE LENGTH
OF RUN FROM SOURCE.
CONNECTING TO AN EXTERNAL FUEL TANK
(BLAZE 200 D TURBO)
Beckett AFG is fitted with 3/8” SAE male fittings and is set up for a 2 line system to eliminate
priming. Ensure fuel tank has a supply line and a return line and connect the supply line to the 3/8”
SAE fitting on the inlet side of the fuel filter and the return line to the return fitting located on the
Dimensions
48.51” x 30.6” x
40.1”
48.51” x 30.6” x 40.1”
FLUE SIZE
4”