OPERATION
OPERA
TION
#415-R1
8-15-18 - JR
time (in seconds) between when the move
command is given to the saw and when the
pinch roll motor starts to run to feed a board.
The Saw IP address used to communicate
with the saw. The Outer Blade Max Position
should be set to the rip width that is between
the first blade and the outer blade when
the outer blade is in it's home position. This
value should be adjusted to calibrate the
width of the outer rips. The Outer Blade
Min Rip should be set to the minimum rip
width that can be obtained between the
outer movable blade and it's neighbor before
physical interference occurs. The Movable
Blade Kerf should be set to the kerf of the
outer blade. This is used when edging
boards on the outer blade. The Saw Pulses
per Inch determines how far the saw moves
when commands are given. The Saw
Script contains scripts for homing and move
commands.
Laser System Type
- This should be set to
match the laser system on the machine. If
it is set to movable lasers, The "Edit Lasers"
button will bring up another window with
additional system parameters pertaining to
the lasers. The number of fixed and movable
lasers in this window should match what
is on the machine. The home positions
are offsets (in inches) from the position of
the first laser. These offsets don't need to
be adjusted here since they are adjusted
automatically when doing a laser setup. Up
to two movable lasers may be controlled
by counter cards in the main PLC. The
remaining movable lasers are controlled by
separate PLCs. The counter card profile
determines how fast the lasers that are
controlled by the counter cards move (1
through 7). If this is set too high, lasers
may lose their positions. Laser acceleration
sets the acceleration rates for the remaining
Summary of Contents for Opti-Rip 415A-M1
Page 5: ...5 INTRODUCTION INTRODUCTION INTRODUCTION ...
Page 9: ...9 RULES FOR SAFE OPERATION RULES FOR SAFE OPERATION 415 R1 RULES FOR SAFE OPERATION ...
Page 14: ...14 INSTALLATION INSTALLATION 415 R1 8 15 18 JR INSTALLATION ...
Page 25: ...25 OPERATION OPERATION 415 R1 8 15 18 JR OPERATION ...
Page 46: ...46 OPERATION OPERATION 415 R1 8 15 18 JR ...
Page 56: ...56 TROUBLESHOOTING TROUBLESHOOTING 415 R1 8 15 18 JR TROUBLESHOOTING ...
Page 63: ...63 MAINTENANCE MAINTENANCE 415 R1 8 15 18 JR MAINTENANCE ...
Page 66: ...66 PARTS SERVICE PARTS SERVICE 415 R1 8 15 18 JR PARTS SERVICE ...
Page 69: ...69 PARTS SERVICE PARTS SERVICE 415 R1 8 15 18 JR ...
Page 70: ...70 PARTS SERVICE PARTS SERVICE 415 R1 8 15 18 JR ...
Page 71: ...71 PARTS SERVICE PARTS SERVICE 415 R1 8 15 18 JR ...
Page 72: ...72 PARTS SERVICE PARTS SERVICE 415 R1 8 15 18 JR ...
Page 73: ...73 PARTS SERVICE PARTS SERVICE 415 R1 8 15 18 JR ...