background image

P

age 

23

 - Manual 

FA01440-EN

  - 07/2020 - © C

AME S.p.A. - The contents of this manual may be changed at any time and without notice. - T

ranslation of the o

riginal instructions

RSE speed

Set the remote connection system communication speed on the RSE1 port.

F63

RSE speed

0 = 1200 bps
1 = 2400 bps
2 = 4800 bps
3 = 9600 bps
4 = 14400 bps
5 = 19200 bps
6 = 38400 bps (default)
7 = 57600 bps
8 = 115200 bps

FCA FCC warnings

Configure the method with which the FCA and FCC outputs report the boom status.

F70

FCA FCC warnings

OFF (Default)
1 = Impulse
When the boom reaches the travel end point (while opening or closing), the FCA-CM1 
or FCC-CM2 contact closes for one second.
2 = Steady
When the boom reaches the travel end point (while opening or closing), the FCA-CM1 
or FCC-CM2 contact closes and remains closed.
3 = Custom
The FCA-CM1 contact is closed with the boom in the open travel end position and 
during the opening manoeuvre. The FCC-CM2 contact is closed with the boom in the 
closed travel end position and during the closing manoeuvre.

Opening counter

With the function active, you can send a series of opening commands corresponding to the number of vehicles which have to be authorised to pass through the 
gate. The function can only be operated by control devices connected to the contact 2-3. The magnetic contact, to which the loop that counts vehicles in transit is 
connected, is connected to an input. This input must be programmed to operate in C5/C9/C10 mode. At the end of the count the passage is closed.

F75

Opening counter

OFF (Default)
ON

Boom drop-away detection

Activate the contact on the ARM terminal board for detecting the boom drop-away.

F78

Boom drop-away detection

OFF (default)
ON

New user

Register up to a maximum of 250 users and assign a function to each one.

 The operation can be carried out by using a transmitter or another control device. The boards that manage the control devices (AF - R700 - R800) must 

be inserted into the connectors.

 Download the LIST OF REGISTERED USERS form from the docs.came.com portal by typing in L20180423.

U1

New user

1 = Step-by-step
3 = Open
4 = Partial opening
When the barrier is in [Paired] mode, the [Partial Opening] command opens the Master 
barrier.

1 -Choose the function to be assigned to the user.
2 -Press ENTER to confirm.
You will be asked to enter your user code.
3 -Send the code from the control device.
Repeat the procedure to add other users.

Summary of Contents for GARD PT Brushless

Page 1: ...Automatic road barriers GARD PT Brushless GPT40AGS GPT40RGS GPT40AGL INSTALLATION MANUAL FA01440 EN EN English...

Page 2: ...as been damaged or if the boom is no longer intact as the result of an accident or installation error In these cases the tensioned springs no longer guarantee that the boom is balanced The boom may su...

Page 3: ...th the installation rules It should completely cut off the power supply according to category III surcharge conditions Demarcate the entire site properly to prevent unauthorised personnel from enterin...

Page 4: ...uidelines DISPOSING OF THE PACKAGING The packaging materials cardboard plastic etc can be disposed of easily as solid urban waste separated for recycling Before dismantling and disposing of the produc...

Page 5: ...s MODELS GPT40AGS GPT40RGS GPT40AGL Max net clearance width m 3 8 3 8 3 8 Technical data MODELS GPT40AGS GPT40RGS GPT40AGL Power supply V 50 60 Hz 230 AC 120 AC 230 AC Motor power supply V 36 DC 36 DC...

Page 6: ...ier 1 Boom anchoring plate 2 Fastening flange 3 Anti shearing cover 4 Protective cover fastening screws 5 Control panel 6 Mechanical stop for the boom adjustment 7 Gear motor with encoder 8 Lever arm...

Page 7: ...rminal board for NC contact for boom drop away 16 Terminal board for NC contact for gearmotor release 17 Terminal board associated with the RSE_2 connector for CRP or CAME KEY connection 18 Terminal b...

Page 8: ...h 60245 IEC 57 IEC when operating indoors use H05VV F cables compliant with 60227 IEC 53 IEC For power supplies up to 48 V you can use FROR 20 22 II cables compliant with EN 50267 2 1 CEI If the cable...

Page 9: ...in place Preliminary operations If the flooring does not allow the device to be fastened in a solid and stable way lay a cement slab Dig a hole for the foundation frame Set up the corrugated tubes ne...

Page 10: ...out notice Translation of the original instructions Fill the hole with soil around the concrete block Remove the nuts from the screws Thread the electrical cables into the tubes so that they protrude...

Page 11: ...he boom opening direction The barrier is set up for installation on the left 1 Check that the lever arm is positioned vertically 2 Remove the mechanical stop 3 Attach the mechanical stop to the right...

Page 12: ...illimetres 2 Insert the slot cover profiles into the grooves on both sides of the boom 3 Fit the rubber end cap in position 4 Insert the anti impact rubber profile into the groove aligning it with the...

Page 13: ...1 A1 2 A1 1 A1 2 Balance springs NO NO A1 1 A1 2 001G02807 fixed support must be used for passage clearance widths exceeding 3 m With A1 1 fast profile the boom opening time varies from 1 2 to 2 5 sec...

Page 14: ...any time and without notice Translation of the original instructions Correct the boom s vertical position Release the gearmotor Open the inspection hatch 1 Turn the mechanical stop until you reach the...

Page 15: ...s must pass through the ferrite included in the supply 1 1 Power supply Make sure the mains power supply is disconnected during all installation procedures Before working on the control panel disconne...

Page 16: ...d selector 5 TEMPORARY STOP button NC contact It stops the boom and excludes the automatic closing after 15 seconds the barrier opens slowly If the contact is not used it must be deactivated during pr...

Page 17: ...hatch is open the gearmotor is released or the boom has fallen A B GND A B GND R G B 2 10 S1GND A B 11 E1 E6 TS 1 2 3 3P 4 5 7 2 CX CY CZ FA FC FCA CM1 FCC CM2 MOTOR BLOCK 1 2 3 4 Safety devices Conne...

Page 18: ...cells Standard connection Multiple photocell pairs can be connected DIR DELTA S photocells Connection with safety test Multiple photocell pairs can be connected See function F5 Safety devices test 2 1...

Page 19: ...After powering up the system the first manoeuvre is always to open the gate Wait for the manoeuvre to be completed Press the ESC button or STOP button immediately in the event of any faults malfuncti...

Page 20: ...sure at the travel end during opening C7 Reopen while closing sensitive edges C9 Immediate closure at the travel end during opening with obstacle standby during closure C10 Immediate closure during op...

Page 21: ...rier opening and remains deactivated until the barrier is closed again 3 The electric lock is deactivated during boom opening or closing but it is active when the barrier is open or closed Light E1 Ch...

Page 22: ...nction is displayed only when a USB stick is inserted into the USB port or when a memory roll card is inserted into the control board F50 Save data OFF Default ON Read data Upload user data timings an...

Page 23: ...mands corresponding to the number of vehicles which have to be authorised to pass through the gate The function can only be operated by control devices connected to the contact 2 3 The magnetic contac...

Page 24: ...mitters with a different type of radio coding saved previously will be deleted U4 Radio decoding 1 All Default 2 Rolling code 3 TW key block Boom length Set the boom length A1 Boom length 1 up to 2 5...

Page 25: ...irmware update file H2 Update the FW from USB OFF Default ON Import export data 1 Insert a USB flash drive into the USB port 2 Press the Enter button to access programming 3 Use the arrows to choose t...

Page 26: ...Page 26 Manual FA01440 EN 07 2020 CAME S p A The contents of this manual may be changed at any time and without notice Translation of the original instructions FINAL OPERATIONS...

Page 27: ...ntrol board which will be set as the MASTER A B GND A B GND 1 2 3 3P 4 5 7 2 CX CY CZ FCA CM1 FCC CM2 RSE A B GND A B GND 1 2 3 3P 4 5 7 2 CX CY CZ FCA CM1 FCC CM2 RSE UTP CAT 5 max 1000 m Programming...

Page 28: ...devices and accessories For information on connecting the electrics for the devices and accessories please see the ELECTRICAL CONNECTIONS section The control and safety devices must be connected on b...

Page 29: ...20 CAME S p A The contents of this manual may be changed at any time and without notice Translation of the original instructions 2 ONLY OPEN command 2 3 on barrier B 3 OPEN CLOSE command 2 7 on barrie...

Page 30: ...es with seasonal closures release the spring and remove the boom For information on correct installation and adjustments please see the product installation manual For information on choosing products...

Page 31: ...cle detected during opening E11 The maximum number of obstacles detected consecutively has been exceeded E14 Serial communication error E15 Incompatible transmitter error E16 Open SLAVE motor hatch er...

Page 32: ...AME S p A The contents of this manual may be changed at any time and without notice Translation of the original instructions CAME S p A Via Martiri della Libert 15 31030 Dosson di Casier Treviso Italy...

Reviews: