STAGE 3
COMMISSIONING THE CONTROL PANEL
3.1 - Initial Wiring & Control Panel Setup
13
1.
CONNECT POWER TERMINALS L1 - L2
AND A SUITABLE EARTH (
L2
BEING
LIVE!
)
2.
SELECT THE MOTOR POWER SETTING ON
THE TRANSFORMER TO LEVEL 1 FOR
COMMISSIONING
Fig 12
3.
INSERT THE ‘START-UP’ CAPACITOR INTO
THE CONTROL PANEL. THE TWO BLACK
WIRES SHOULD BE CONNECTED TO THE
CAPACITOR.
4.
ENSURE THAT THE MOTORS ARE
ADEQUATELY
EARTHED
ZA4
Fig 13
Summary of Contents for FROG series
Page 30: ...NOTES...
Page 31: ...NOTES...