END OF INSTALLATION
STAGE 2
BEFORE STARTING STAGE 3 -
Commissioning the Control Panel
PLEASE CHECK THAT YOU HAVE CORRECTLY:
Ref
Page
1. FITTING THE CONTROL PANEL
IN THE CASING
2.1
8
2. WIRED THE MOTOR AS SHOWN (Fig 7)
2.2
9
12
3. WIRED IN THE SAFETY PHOTOCELLS
AS SHOWN (Fig 8)
2.3
10
4. INSERTED THE RADIO FREQUENCY
CARD AS SHOWN (Fig 9)
2.4
10
5. WIRED IN THE TUNED ANTENNA
CODED AS SHOWN (Fig 10)
2.5
11
6. PROGRAMMED THE REMOTE CONTROLS
AS SHOWN (Fig 11)
2.6
11
7. POWERED UP THE CONTROL PANEL
2.7
11
NOW STAGE 2 IS FULLY COMPLETED YOU ARE READY TO
BEGIN STAGE 3 OF YOUR FROG AUTOMATION KIT
INSTALLATION
12
Summary of Contents for FROG series
Page 30: ...NOTES...
Page 31: ...NOTES...