INSTALLATION
⚠
The following illustrations are mere examples in that the space for fastening the operator and accessories varies depending on the installation
area. It is up to the installer to find the most suitable solution.
The drawing show an operator fitted on the left.
Corrugated tube laying
Dig a hole for the foundation frame.
Set up the corrugated tubes needed for making the connections coming out of the junction pit. For connecting the gearmotor we suggest using a
Ø 40 mm corrugated tube and Ø 25 mm tubes for the accessories.
The number of tubes depends on the type of system and the accessories you are going to fit.
Laying the anchoring plate
Set up a foundation frame that is larger than the anchoring plate and sink it into the dug hole. The foundation frame must jut out by 50 mm above
ground level.
Fit an iron cage into the foundation frame to reinforce the concrete.
Fit the bolts into the fastening plate and tighten them using the nuts. Remove the pre-shaped clamps using a screw driver or pliers.