
Installation Guide for RFU-D-HP
Page 170 of 179
5 Assemble the OCU Mounting Kit. See Section Chapter 0,
Assembling the OCU Mounting Kit
6 Assemble four OCUs, two using a Left Rail Configuration and two using a Right Rail Configuration. Attach
an RFU-D-HP radio to each OCU, and connect the radio-OCU assemblies to the Branching Pole Profile as
shown in the following figure. See Section Chapter 0,
Left
(1)
Left
(3)
Right
(2)
Right
(4)
7 On the side of the OCU facing the pole, for each pair of adjacent OCUs attach two Short U-Bends
between the adjacent radio ports. See Section Chapter 0,
8 On the side facing away from the pole (refer to the numbering in the figure above):
o
Connect a Splitter to each radio port of OCU 1. See Section Chapter 0, Assembling a Splitter or Coupler for
Filter-Based Branching
o
Connect a flexible waveguide from the upper Splitter to the upper radio port of OCU 3.
o
Connect a flexible waveguide from the lower Splitter to the lower radio port of OCU 3.
o
Attach a Termination to each of the radio ports on OCU 2 and OCU 4. See Section Chapter 0,
Summary of Contents for PTP 820 Series
Page 1: ...Installation Guide ...
Page 69: ...Installation Guide for RFU D HP Page 69 of 179 ...
Page 75: ...Installation Guide for RFU D HP Page 75 of 179 ...
Page 91: ...Installation Guide for RFU D HP Page 91 of 179 ...
Page 93: ...Installation Guide for RFU D HP Page 93 of 179 ...
Page 102: ...Installation Guide for RFU D HP Page 102 of 179 ...
Page 120: ...Installation Guide for RFU D HP Page 120 of 179 ...
Page 143: ...Installation Guide for RFU D HP Page 143 of 179 1 4 2 5 3 OCU ...