ENCORE LITE Rev. 3 05/2018
83
www.cafection.com 800-561-6162
SERVICE & INSTALLATION MANUAL for Cafection's Encore Lite
ANNEX 3 WEEKLY MAINTENANCE SCHEDULE
A
n
n
ex
3
WEEKLY MAINTENANCE SCHEDULE
All important parts of the unit must be maintained as per the Maintenance Schedule to honor the warranty and to
avoid possible defects. Adequate maintenance will extend the life of the coffee machine and deliver a consistent
high quality beverage.
PERFORMED BY THE
SER
VICE PROVIDER
Clean the brew group with a commercial urn cleaner.
PREVENTIVE MAINTENANCE SCHEDULE AT DIFFERENT CYCLES
Check & replace the outlet valves.
Check & replace the water filter.
10,000 cycles
5,000 cycles
Replace the brew group via Cafection’s Brew Group Exchange Program.
Replace the whipping motor(s).
25,000 cycles
Delime the water tank & outlet valves.
50,000 cycles
Replace the grinder burrs.
Replace the water tank float, the heater switch & the water level switch.
100,000 cycles
ENCORE Series
MVF 04-2017
WEEKLY MAINTENANCE
Verify the filter paper level.
Sanitize the brew chamber with a hot water cycle.
Sanitize the solubles mixing bowl with a hot water cycle.
Capture data from the software.
Verify the overflow cup.
Verify the overflow tray.