ENCORE LITE Rev. 3 05/2018
www.cafection.com 800-561-6162
76
SERVICE & INSTALLATION MANUAL for Cafection's Encore Lite
9.4
Main Board
Like any electronic main board, the one in this brewer is very sensitive to power surges inside
buildings. If an issue persists after changing the main board, verify the power source. Use the
necessary precautions for handling static sensitive devices.
Removing
1. Retrieve all the brewer's data (see section 6.6.2).
2. Turn off the machine and unplug it from the outlet.
3. Open the door and remove the protection panel (inside the
door) by unscrewing the four (4) screws.
4. Unplug the connections (clockwise from the top left corner):
MDB Port
J11 (if coin changer, bill acceptor or card reader)
Main board
: J12, J18, J27, J2, J19, J3, J6, J14, J21, J22
5. Unscrew the four (4) plastic 1" posts.
6. Remove the board.
Reinstalling
1. Reinstall the board and fasten it with the four (4) plastic 1" posts.
2. Plug the connections (refer to the board diagram in section 3.6 for a full-size view).
3. Verify that all connections are in place. The board will fail if the connections are reversed or in
the wrong place.
4. Reinstall all parts in reverse order. Reinstall the protection panel with the four (4) screws.
5. Plug in the brewer and turn it on.
6. Verify that everything all is functioning on the screen.
All cables must be replaced in the correct order and direction before turning the
power on, or the board will fail and be damaged.
P
a
rt
s Ma
in
te
na
nc
e