background image

TR-MAN-6003

 

3-POINT HITCH HOSE CADDY 

 

Page 20 of 24 

 

 

Decals 

 

6003

(All Models)

10

11

1

2

10

6

3

5

6

4

9

8

9

7

4

10

7

6

4

4

2

5

1

9

10

11

8

 

TR-MAN-6003 

 

3-POINT HITCH HOSE CADDY 

 

Page 5 of 24 

 

When Applying Liquid Manure 

Environmental concerns seem to be driving legislative agendas in many agricultural 

areas across the continent. Current and pending laws in many agricultural regions of 
North America are changing the ways in which the agricultural community is expected 
to manage their liquid animal waste products. 

The changes in legislation typically target two main issues; run-off prevention during 

and after application and soil nutrient loading.  

Run off seems to be the largest concern with nutrient application. Run off may result 

from several different factors, most of which are controllable. These factors include; 
exceeding the soil intake rate; nutrient application on steep grades; high application 
amounts; leaking mainline fittings and seals; sudden rainfall during or immediately after 
application; ground frost; etc. Constant watch must be kept and immediate action taken 
when necessary to prevent run off from occurring.  

Soil nutrient loading depends on many variables. Some of these variables (but 

certainly not all) are soil type, type of crop being grown in the irrigated area, application 
timing, nutrient value of the material being applied (nutrient value should be assessed 
at the time of application as it can change throughout the year), etc. 

Soil type will determine the intake rate at which liquid may be applied. Cultivation of 

the field just prior to application can improve the intake rate of some soils. 

Great potential benefit lies in using the nutritional value of the nutrient being applied 

to replace some or all of the traditional chemical fertilizer used. Application timing and 
amount are important considerations. Soil analysis taken prior to planting and during 
the growth periods of the crop will help determine if there is room for further application 
amounts to be added prior to crop maturity. A total management plan should include 
provisions to end the crop season without surplus nutrients left as residual. These 
excess nutrients typically end up in the ground water supply. Local colleges, 
universities and agricultural extension services are usually a good source of 
information. They can usually help you determine an application program that prevents 
soil nutrient overload due to excess application. 

Cadman Power Equipment Limited

 cannot possibly provide up-to-date 

recommendations with regard to the legal obligations you must deal with in your 
particular area. However, as a manufacturer of equipment used in nutrient application 
(liquid manure, milk house run-off, etc.), we feel it necessary to make you aware that 
the municipal, regional and state governing bodies in your area may have recently 
enacted new legislation or revised existing legislation with regard to nutrient handling 
practices and procedures. 

It is your responsibility to make yourself aware of and abide by the current legislation 

in your area. Please take the time to contact your local agricultural representative to 
obtain the latest information regarding legal handling and application of nutrient. 

Summary of Contents for 6003

Page 1: ...CADMAN 6003 3 Point Hitch Hose Caddy OPERATOR S PARTS and MAINTENANCE MANUAL 2007 EDITION TR MAN 6003...

Page 2: ......

Page 3: ...Imperial Gallons 231 Cubic Inches 0 1337 Cubic Feet 8 345 Pounds 1 CUBIC FOOT 1728 Cubic Inches 7 48 Gallons US 62 4 Pounds 28 32 Liters 1 ACRE INCH 27154 Gallons US 254 Cubic Meters Hectare AREA OF A...

Page 4: ...ms and tighten loosened items Clean unit N A Wash down the unit s exterior Washing thoroughly with reduce corrosion damage Lubricate drive chain N A Brush the drive chain with acceptable grease see Lu...

Page 5: ...ned when it has no visible slack and is seating properly onto the drive pegs when the drum rotates Adjustments are made by turning the locknut 3 4 wrench on the spring adjustment rod Lubricate all gre...

Page 6: ...nd its dealers who are neither authorized nor qualified to undertake any obligations on behalf of CADMAN POWER EQUIPMENT LIMITED DO NOT under any circumstances accept any responsibility for any losses...

Page 7: ...iquid may be applied Cultivation of the field just prior to application can improve the intake rate of some soils Great potential benefit lies in using the nutritional value of the nutrient being appl...

Page 8: ...parts MUST be replaced or repaired before the machine is put into service This symbol the safety alert symbol indicates a hazard When you come across this safety alert symbol in this manual make certa...

Page 9: ...e Receiver Tank containing a large amount of fluid Be sure to allow enough spreading area to properly distribute the hose contents 6 hose contains approximately 1 US Gallons per foot 8 hose contains a...

Page 10: ...BUSHING 1 1 4 X 5 16 IN KEYWAY 10 BUS QD125 1 4 80 RIVETED ROLLER CHAIN LINK 10 CHN 80 1RIV 78 5 80 CONNECTING LINK 10 LNK 80CONN 1 6 80 12 X 3 4 IDLER SPROCKET 10 SPT 80 12IDLER 1 7 80 QD 15 SPROCKET...

Page 11: ...mplete the following instructions to unload your Hose Caddy Step 1 Connect your tractors 3 Point Hitch to the Hose Caddy You can mount this unit on most Category 2 3 or 3N three point hitch system and...

Page 12: ...CADDY 3PT HITCH 19 400 1 6 DRUM WELDMENT 19 500 1 7 CHAIN GUARD WELDMENT 19 601 1 8 TOOL BOX DOOR 19 602 2 9 BRASS HINGE PIN 19 603 2 10 LABEL GREASE POINT 40 041 A 1 11 LABEL ENTANGLEMENT 40 051 A 1...

Page 13: ...se end Disconnect a section of the soft hose by uncoupling the clamp Never pull more than two 2 hoses at one time Extensive damage to your Hose Caddy will result Step 2 Position the Hose Caddy with th...

Page 14: ...3 POINT HITCH HOSE CADDY Page 13 of 24 Parts Section From Serial Number 0710603HC63 6003 Frame Assembly 14 Drive Assembly 16 Decals 20 Up to Serial Number 0700507HC63 6003 Drive Assembly 18 All assemb...

Page 15: ...3 POINT HITCH HOSE CADDY Page 13 of 24 Parts Section From Serial Number 0710603HC63 6003 Frame Assembly 14 Drive Assembly 16 Decals 20 Up to Serial Number 0700507HC63 6003 Drive Assembly 18 All assemb...

Page 16: ...se end Disconnect a section of the soft hose by uncoupling the clamp Never pull more than two 2 hoses at one time Extensive damage to your Hose Caddy will result Step 2 Position the Hose Caddy with th...

Page 17: ...CADDY 3PT HITCH 19 400 1 6 DRUM WELDMENT 19 500 1 7 CHAIN GUARD WELDMENT 19 601 1 8 TOOL BOX DOOR 19 602 2 9 BRASS HINGE PIN 19 603 2 10 LABEL GREASE POINT 40 041 A 1 11 LABEL ENTANGLEMENT 40 051 A 1...

Page 18: ...mplete the following instructions to unload your Hose Caddy Step 1 Connect your tractors 3 Point Hitch to the Hose Caddy You can mount this unit on most Category 2 3 or 3N three point hitch system and...

Page 19: ...BUSHING 1 1 4 X 5 16 IN KEYWAY 10 BUS QD125 1 4 80 RIVETED ROLLER CHAIN LINK 10 CHN 80 1RIV 78 5 80 CONNECTING LINK 10 LNK 80CONN 1 6 80 12 X 3 4 IDLER SPROCKET 10 SPT 80 12IDLER 1 7 80 QD 15 SPROCKET...

Page 20: ...e Receiver Tank containing a large amount of fluid Be sure to allow enough spreading area to properly distribute the hose contents 6 hose contains approximately 1 US Gallons per foot 8 hose contains a...

Page 21: ...parts MUST be replaced or repaired before the machine is put into service This symbol the safety alert symbol indicates a hazard When you come across this safety alert symbol in this manual make certa...

Page 22: ...iquid may be applied Cultivation of the field just prior to application can improve the intake rate of some soils Great potential benefit lies in using the nutritional value of the nutrient being appl...

Page 23: ...nd its dealers who are neither authorized nor qualified to undertake any obligations on behalf of CADMAN POWER EQUIPMENT LIMITED DO NOT under any circumstances accept any responsibility for any losses...

Page 24: ...ned when it has no visible slack and is seating properly onto the drive pegs when the drum rotates Adjustments are made by turning the locknut 3 4 wrench on the spring adjustment rod Lubricate all gre...

Page 25: ...ms and tighten loosened items Clean unit N A Wash down the unit s exterior Washing thoroughly with reduce corrosion damage Lubricate drive chain N A Brush the drive chain with acceptable grease see Lu...

Page 26: ...Imperial Gallons 231 Cubic Inches 0 1337 Cubic Feet 8 345 Pounds 1 CUBIC FOOT 1728 Cubic Inches 7 48 Gallons US 62 4 Pounds 28 32 Liters 1 ACRE INCH 27154 Gallons US 254 Cubic Meters Hectare AREA OF A...

Reviews: