TR-MAN-6003
3-POINT HITCH HOSE CADDY
Page 14 of 24
Frame Assembly
∗
6003
(All Models)
TR-MAN-6003
3-POINT HITCH HOSE CADDY
Page 11 of 24
Loading Your Hose Caddy
Prior to loading the Hose Caddy Cadman Power Equipment Limited
recommends that you clean the hoses with a proper clean-out
procedure (i.e. clean-out ball launcher or water flushing).
Complete the following instructions to load your Hose Caddy…
Step 1
Position the Hose Caddy relatively straight to the hose end. Disconnect a section of
the soft hose by uncoupling the clamp.
Never pull more than two (2) hoses at one time. Extensive damage to
your Hose Caddy will result.
Step 2
Position the Hose Caddy with the tractor so that one end of the soft hose can be
inserted into the opening in the hose drum. (see Figure 5)
Figure 5 - Insert Hose into Reel Opening
img-00171.png
Step 3
With one end of the soft hose inserted into the drum, engage the tractor hydraulics so
that the drum rotates towards the tractor.
Step 4
Guide the hose so that it is evenly distributed over the entire reel.
Step 5
When the first hose has been retrieved, return to Step 1 for the remaining hoses.
Summary of Contents for 6003
Page 2: ......