Installing a Power Supply Module
6C110 Overview and Setup Guide
3-15
Figure 3-11
Installing the Power Supply Module(s)
After installation of the power supply modules is completed the 6C110 is
ready to be powered up; however, Cabletron Systems recommends that
installation of all modules for the 6C110 be completed before powering
up the 6C110. Refer to the following sections to complete the installation.
Slotted Screw
Power Supply LEDs
Mandatory Power Supply Installed
in Slot PS1
Power Supply Handle
Slotted Screw
Circuit Card
Card Guides
Metal Back-Panel
2016_09
6C405
Summary of Contents for SmartSwitch 6500
Page 1: ...6C110 SmartSwitch 6500 Overview and Setup Guide 9032752 02...
Page 2: ......
Page 8: ...Contents vi 6C110 Overview and Setup Guide...
Page 16: ...Chapter 1 Introduction 1 8 6C110 Overview and Setup Guide...
Page 24: ...Chapter 2 Installation Requirements and Specifications 2 8 6C110 Overview and Setup Guide...
Page 50: ...Chapter 3 6C110 Setup 3 26 6C110 Overview and Setup Guide...