Chapter 3: Installation
3-2
ESX-1320/ESX-1380 Installation Guide
3.1
UNPACKING THE ESX
Unpack the ESX as follows:
1. Remove the shipping material covering the ESX.
2. Verify the contents of the packing carton. The carton, as shipped,
should contain the following items:
•
ESX-13XX
•
Firmware Images, 2
•
Grounding strap
•
RJ45 Adapter Kit
•
Release Notes
•
Rack Mounting Kit
•
Accessory Kit
•
ESX-1320/ESX-1380 Installation Guide
•
ESX-1320/ESX-1380 Local Management Guide
3. If any of these items are missing, contact Cabletron Systems Technical
Support immediately. For help, refer to Section 1.5.
4. Carefully remove the ESX from the shipping box.
5. Visually inspect the ESX. If there are any signs of damage, contact
Cabletron Systems Technical Support immediately. For help, refer to
Section 1.5.