![C-COR.net FlexNet E7 Equipment Manual Download Page 75](http://html1.mh-extra.com/html/c-cor-net/flexnet-e7/flexnet-e7_equipment-manual_3080992075.webp)
Rev F
Maintenance
6-5
6
RF Module Installation
➤
To install the RF module
1. Ensure that the
POWER SUPPLY FUSE
is removed. If not, then remove it according to
procedures in
2. Firmly press the RF module into the housing until the back of the module contacts the inside
of the housing.
3. Using a flat-blade screwdriver, start the four (4)
MODULE HOLD DOWN
screws into the
threaded receptacles in the housing. Tighten the screws alternately to prevent stressing the
module or housing. Torque to between 25 and 30 in-lbs (2.8 and 3.4 N·m).
4. Using a fuse puller, install the
POWER SUPPLY FUSE
.
5. Perform the appropriate voltage testing based on power supply type according to
Voltage
Testing
on pages 4-2 through 4-4..
WARNING
: Hazardous voltages are present. Use approved safety equipment and
procedures.
CAUTION
: Arcing between the RF module and the centerseizure assemblies will damage the
unit. Remove the
POWER SUPPLY FUSE
before removing the RF module.
Summary of Contents for FlexNet E7
Page 2: ...Introduction fm Page 10 Monday April 1 2002 12 43 PM...
Page 16: ...1 8 FlexNet 700 Series Line Extender Rev F 1...
Page 26: ...2 10 FlexNet 700 Series Line Extender Rev F 2...
Page 64: ...4 22 FlexNet 700 Series Line Extender Rev F 4...
Page 82: ...A 6 FlexNet 700 Series Line Extender Rev F A...
Page 88: ...B 6 FlexNet 700 Series Line Extender Rev F B...
Page 102: ...C 14 FlexNet 700 Series Line Extender Rev F C...
Page 104: ...D 2 FlexNet 700 Series Line Extender Rev F D...
Page 110: ...Index 4 Rev F...
Page 111: ...Introduction fm Page 10 Monday April 1 2002 12 43 PM...