Rev F
Housing Instructions
3-1
C H A P T E R 3
Housing Instructions
This chapter describes housing installation, proper opening and closing techniques to be used when
accessing the internal components, as well as recommended cable attachment procedures.
Housing Closing and Tightening
Preparing for Installation
➤
To inspect the housing
1. Ensure that the following are included with each housing:
■
two (2) mounting hardware kits (P/N HB0214) each consisting of:
–
one strand clamp
–
one lock washer
–
one 1/4-20UNC x1-inch bolt
–
one rubber O-ring (retaining)
2. Inspect the outside of the housing:
a. Check the convection fins, cable entry ports, cover bolts, and all testpoint connectors
for damage (refer to Figure ).
b. Make sure that each port hole is plugged with a plastic insert.
Note
: Check the unit for damage. If there is shipping damage, contact the shipping
company and the C-COR Shipping Department.
Summary of Contents for FlexNet E7
Page 2: ...Introduction fm Page 10 Monday April 1 2002 12 43 PM...
Page 16: ...1 8 FlexNet 700 Series Line Extender Rev F 1...
Page 26: ...2 10 FlexNet 700 Series Line Extender Rev F 2...
Page 64: ...4 22 FlexNet 700 Series Line Extender Rev F 4...
Page 82: ...A 6 FlexNet 700 Series Line Extender Rev F A...
Page 88: ...B 6 FlexNet 700 Series Line Extender Rev F B...
Page 102: ...C 14 FlexNet 700 Series Line Extender Rev F C...
Page 104: ...D 2 FlexNet 700 Series Line Extender Rev F D...
Page 110: ...Index 4 Rev F...
Page 111: ...Introduction fm Page 10 Monday April 1 2002 12 43 PM...