Rev F
Configuration
4-1
C H A P T E R 4
Configuration
This chapter contains the procedures for the initial setup of the E7 Line Extender. Included are power
supply set up and testing, balancing carrier levels, temperature compensation, forward and return
balancing, as well as various upgrade kit installation instructions.
Calculating Balancing Carrier Levels
Active Return Upgrade Kit Installation
Power Supply Configuration
Power Supply Setup
Refer to
Fuse/Brass Shorting Bar (Slug) Replacement
on page 6-1 for all fuse removal and installation
procedures.
➤
To set up the power supply
1. Open the housing. (Refer to
on page 3-4 if necessary.)
CAUTION
: To prevent hybrid damage, C-COR recommends that all amplifiers in a power
supply group have PADS and equalizers installed in the forward RF path before
energizing. The initial recommended accessory values are shown on your system maps.
WARNING
: Hazardous voltages are present. Use approved safety equipment and
procedures.
CAUTION
: The
MAIN FUSE
must be the specified value (See Table 4.1) to adequately
protect the power supply and amplifier. Installing a slug or surge terminator may damage
the amplifier.
Summary of Contents for FlexNet E7
Page 2: ...Introduction fm Page 10 Monday April 1 2002 12 43 PM...
Page 16: ...1 8 FlexNet 700 Series Line Extender Rev F 1...
Page 26: ...2 10 FlexNet 700 Series Line Extender Rev F 2...
Page 64: ...4 22 FlexNet 700 Series Line Extender Rev F 4...
Page 82: ...A 6 FlexNet 700 Series Line Extender Rev F A...
Page 88: ...B 6 FlexNet 700 Series Line Extender Rev F B...
Page 102: ...C 14 FlexNet 700 Series Line Extender Rev F C...
Page 104: ...D 2 FlexNet 700 Series Line Extender Rev F D...
Page 110: ...Index 4 Rev F...
Page 111: ...Introduction fm Page 10 Monday April 1 2002 12 43 PM...