Rev F
Introduction
1-7
1
Materials
Fixed Slope Feed through
(MEQ Stripline)
Zero slope adjustment (P/N MEQ-550-0)
Line extender alignment if EQ
jumpers are cut
Fixed Attenuator Feed
through (PAD Stripline)
Zero gain adjustment (P/N SPB-0)
Line extender alignment if PAD
jumpers are cut
Return Upgrade Kit
(See Table 4.5)
Return kit installation
Clamps and Bolts
C-COR, HB0214 or HB0216
(Supplied with the line extender)
Line extender installation
1/4-20 UNC bolts, washers,
and shims
—
Wall mounting
Two diplex filters
P/N 162198-01
Return kit installation in E629
Extension Mounting Brackets
(EMBs)
3.2 or 6 inch (8 or 15cm) length with
mounting hardware (P/Ns 172187-01 and
172187-03)
Installation application
Thermal Joint Compound
—
Return kit installation
1. An 11 mm nutdriver or wrench can normally be used in place of a 7/16-inch tool if the bolt and nutdriver are
manufactured to nominal “across the flat” tolerances. A non-fit can occur if the nutdriver is manufactured to
minimum dimensions and the bolt head to maximum dimensions.
Table 1.2 Tools and Materials
Tools/Materials
Required Characteristic
Use
Summary of Contents for FlexNet E7
Page 2: ...Introduction fm Page 10 Monday April 1 2002 12 43 PM...
Page 16: ...1 8 FlexNet 700 Series Line Extender Rev F 1...
Page 26: ...2 10 FlexNet 700 Series Line Extender Rev F 2...
Page 64: ...4 22 FlexNet 700 Series Line Extender Rev F 4...
Page 82: ...A 6 FlexNet 700 Series Line Extender Rev F A...
Page 88: ...B 6 FlexNet 700 Series Line Extender Rev F B...
Page 102: ...C 14 FlexNet 700 Series Line Extender Rev F C...
Page 104: ...D 2 FlexNet 700 Series Line Extender Rev F D...
Page 110: ...Index 4 Rev F...
Page 111: ...Introduction fm Page 10 Monday April 1 2002 12 43 PM...