Installation | 5
Instruction Manual MINK MM 1104-1142 BV_EN_en
11 | 36
●
Make sure that cooling air inlets and outlets are not covered or obstructed and that the cooling
air flow is not affected adversely in any other way.
●
Make sure that the oil sight glass (OSG) remains easily visible.
●
Make sure that enough space remains for maintenance work.
●
Make sure that the machine is placed or mounted horizontally, a maximum of 1° in any direction
is acceptable.
●
19].
●
Make sure that all provided covers, guards, hoods, etc. are mounted.
If the machine is installed at an altitude greater than 1000 meters above sea level:
●
Contact your Busch representative, the motor should be derated or the ambient temperature
limited.
5.2
Connecting Lines / Pipes
WARNING
Rotating Parts.
Risk of severe injury!
●
Do not operate the machine without suction / discharge connection installed.
●
Remove all protective covers before installation.
●
Make sure that the connection lines cause no stress on the machine‘s connection; if necessary use
flexible joints.
●
Make sure that the line size of the connection lines over the entire length is at least as large as
the connections of the machine.
In case of long connection lines it is advisable to use larger line sizes in order to avoid a loss of effi-
ciency. Seek advice from your Busch representative.
5.2.1
Suction Connection
NOTICE
Ingress of foreign objects or liquids.
Risk of damage to the machine!
If the inlet gas contains dust or other foreign solid particles:
●
Install a suitable filter (5 micron or less) upstream from the machine.
Connection size(s):
– G1 1/4
Depending on the specific configuration ordered, other connection dimensions may apply.