8.1
Maintenance Schedule
The maintenance intervals depend very much on the individual operating conditions. The intervals
given below are considered as starting values which should be shortened or extended as appropri-
ate. Particularly harsh applications or heavy duty operation, such as high dust loads in the environ-
ment or in the process gas, other contamination or ingress of process material, can make it neces-
sary to shorten the maintenance intervals significantly.
Interval
Maintenance work
Monthly
●
Check the inlet screen, clean if necessary.
In case of an inlet filter (IF) being installed:
●
Check the inlet filter cartridge, replace if necessary.
Every 3 months
●
Every 6 months
●
Clean the machine from dust and dirt.
In case of a coupling (CPL) being installed:
●
Check the coupling (CPL) for backlash and wear.
Gas tight version only
Every 5000 hours or after 2 years
Depending on the requirements in terms of gas tightness:
●
Replace sealing rings (contact Busch).
Gas tight version only
Every 10000 hours or after 2
years
●
Check that pressure relief lines (PRL) are not clogged, see
Pressure Relief Lines Maintenance (Gas Tight Version Only)
Every 20000 hours
●
Change the oil.
The change interval of 20000 operating hours is valid for Bus-
ch approved oils only. The change interval depends very much
on the operating conditions. Borderline operation may reduce
the change interval down to approximately 5000 operating
hours. Other oils may reduce the change interval.
Every 6 years
●
Have a major overhaul on the machine (contact Busch).
8.2
Oil Level Inspection
●
Shut down the machine.
●
When the machine is stopped, wait 1 minute before checking the oil level.
MAX
MIN
MAX
MIN
MAX
MIN
The oil level should stay constant over the lifetime of the oil. If the level does fall, this indicates a leak
and the machine requires repair.
●