6 | Commissioning
12 / 24
Instruction Manual R5 KD 0012-0020 A_EN_en
6
Commissioning
NOTICE
The machine can be shipped without oil.
Operation without oil will ruin the machine in short time!
• Prior to commissioning, the machine must be filled with oil, see
.
CAUTION
During operation the surface of the machine may reach temperatures of more than
70°C.
Risk of burns!
• Avoid contact with the machine during and directly after operation.
CAUTION
Noise of running machine.
Risk of damage to hearing!
If persons are present in the vicinity of a non noise insulated machine over extended pe-
riods:
• Make sure that ear protection is being used.
• Make sure that the installation conditions (see
) are met.
• Switch on the machine.
• Make sure that the operating conditions comply with the
.
• After a few minutes of operation, perform an
.
As soon as the machine is operated under normal operating conditions:
• Measure the motor current and record it as reference for future maintenance and
troubleshooting work.
6.1 Conveying Condensable Vapours
Water vapour within the gas flow is tolerated within certain limits. The conveyance of
other vapours shall be agreed upon with Busch.
If condensable vapours are to be conveyed:
Before process:
• Warm up the machine for approximately half an hour.
After process:
• Operate the machine for approximately another half an hour.
Summary of Contents for KD 0012 A
Page 23: ...Note ...