10
Figure 9B: Post attachment bar.
13.
Secure the attachment bar using the two (2) M8 washers and two (2) M8 screws.
Tighten the screws using the 6mm Allen key.
14.
Ensure that the attachment bar has fully clamped the post and there is no movement of
the post.
15. Remove the ground screw and washers (F) using the 3mm Allen key.
Refer to Figure 10.
Figure 10:
Ground screw.
11.
Position the post so that the arch is located at the back of the base, refer to Figure 9A.
Insert the post into the hole in the base. Slide the attachment bar through the square
slots in the post. When inserting the post, make sure the wires (
A
) are facing the front
of the base and
NOT
towards the power supply.
12. Align the holes of the attachment bar with the holes on the base (
B
). Refer to Figure
9B.
WARNING: When performing Step 12 to 14, make sure the attachment
bar is in proper position in the post, and that it is secure to the base.
Failure to do so may cause injury.
Figure 9A: Post orientation.
FRONT
POST
ARCH
POWER
SUPPLY
A
FRONT
B
B
F
Summary of Contents for AIMLED070 Series
Page 36: ...36 10 0 Equipment Anchorage Diagrams Figure 46 Anchorage Seismic single ceiling model ...
Page 37: ...37 Figure 47 Anchorage Seismic double ceiling model ...
Page 38: ...38 Figure 48 Anchorage Seismic wall model ...
Page 39: ...39 Figure 49 Anchorage Seismic wall model ...
Page 42: ...42 13 0 Equipment Maintenance Log ...
Page 43: ...43 NOTES ...