25
Installing the Junction Box
The junction box should normally be placed on top of the support structure. Make sure the
screw holes on the junction box plate correspond to the holes in the ceiling casting. When the
ceiling plate is installed, the bolts will also hold the junction box. If there isn
’
t space for the
junction box on top of the support structure, another suitable location in the ceiling can be
used. It is also possible to use a different junction box if that is more convenient.
6.7 Installing the Ceiling Casting
NOTE: Illustration is for single ceiling version, so only one power supply is shown.
Mount the ceiling casting to the support structure. Make sure the hole in the ceiling
casting above the terminal block aligns with the hole in the junction box. Use three (3)
3/8”
bolts, plain washers, split lock washers, and nuts in a triangular pattern. See
Equipment Anchorage Diagrams for details and refer to your local building codes.
6.8 Installing the Down Tube
6.6 Installing the Junction Box
NOTE
The down tube is pre
-
cut and pre
-
drilled at the factory and will suit most
exam rooms with a ceiling height of 8
-
10 ft. Refer to section 6.1 Mount-
ing Height
”
for further advice.
NOTE
Be certain to slide the bell housing and locking ring on the down tube
before inserting the down tube into the ceiling casting.
Figure 31: Ceiling mount assembly
Summary of Contents for AIMLED070 Series
Page 36: ...36 10 0 Equipment Anchorage Diagrams Figure 46 Anchorage Seismic single ceiling model ...
Page 37: ...37 Figure 47 Anchorage Seismic double ceiling model ...
Page 38: ...38 Figure 48 Anchorage Seismic wall model ...
Page 39: ...39 Figure 49 Anchorage Seismic wall model ...
Page 42: ...42 13 0 Equipment Maintenance Log ...
Page 43: ...43 NOTES ...