7
A
C
D
E
D
F
H
B
B
I
Figure 1.
Part
#
Qty
Description
A
1
Base Cover
B
4
Base Cover Screws
C
1
Electrical Switch Nut
D
2
M8 Attachment Bar Screw and Lock Washer
E
1
Post Attachment Bar
F
1
Ground Screw and Washers
G
1
Post/Upright (not shown below)
H
1
Push Button Switch
I
1
Green Indicator Light
4.0 Floor Stand Model
4.1 Base Post Assembly
Parts (Refer to Figure 1)
Assembly Instructions:
1.
Using your finger release the fuse holder on the power outlet by pushing downward on
the tab and pulling outward. Place the fuse holder aside. See Figure 2.
2.
Using a 3mm Allen Key, remove four (4) x M4 screws (B) from underside of base to
release the plastic cover. Place screws aside for reassembly. Refer to Figure 1.
Fuse Holder
Figure 2.
Summary of Contents for AIMLED070 Series
Page 36: ...36 10 0 Equipment Anchorage Diagrams Figure 46 Anchorage Seismic single ceiling model ...
Page 37: ...37 Figure 47 Anchorage Seismic double ceiling model ...
Page 38: ...38 Figure 48 Anchorage Seismic wall model ...
Page 39: ...39 Figure 49 Anchorage Seismic wall model ...
Page 42: ...42 13 0 Equipment Maintenance Log ...
Page 43: ...43 NOTES ...