Mounting / Installation
Mounting / Installation
4.2.13 Connecting the Unit to the Chimney
Calculate the height of the opening for
the emission pipe. Make sure to take
headroom for the test connection and the
revision T-piece (T-fitting) into account.
2
1
0
m
m
Fig. 17 BOY III with Emission Connection
m
a
x
. 1
6
0
m
m
Ø
1
0
m
m
Fig. 18 Cross Section of the Duct
The opening for mounting the support bar
should be made according to the dia-
gram. Make sure the opening is no lar-
ger than160 mm x 160 mm; otherwise
the cover will not be large enough.
Drill the hole for the support bar with a 10
mm bit. The support bar must be level.
Position the support bar according to the
diagram to the right. The support bar
must be level.
Fig. 19 Installing the Support Bar
- 19 -
Gebr. Bruns GmbH is not responsible for typographical errors or technical inaccuracies and reserves the right to make adjustments.
Gebr. Bruns GmbH
•
Hauptstraße 200
•
26683 Saterland
•
Tel.: + 49 (0) 44 92 / 92 46-0
•
Fax: + 49 (0) 44 92 / 71 41
www.bruns-heiztechnik.de
•