Mounting / Installation
Mounting / Installation
4
Mounting/Installation
4.1
Shipment Contents
Please make sure the shipment is complete and undamaged before you be-
gin with the installation!
The delivery comes in a cardboard box.
Fig. 10 Shipment Contents
Pos.
Anzahl
Bezeichnung
1
1
Condensing Gas Boiler BOY III
2
1
Atmospheric or Temperature Sensor (Optional)
3
1
Pressure Gauge
4
1
Control Keypad with Illuminated Display
5
1
Wall Mounting Track
6
2
Mounting Screws incl. Washers
7
2
Plastic Expansion Studs
8
1
Installation and Operation Manual
- 13 -
Gebr. Bruns GmbH is not responsible for typographical errors or technical inaccuracies and reserves the right to make adjustments.
Gebr. Bruns GmbH
•
Hauptstraße 200
•
26683 Saterland
•
Tel.: + 49 (0) 44 92 / 92 46-0
•
Fax: + 49 (0) 44 92 / 71 41
www.bruns-heiztechnik.de
•
1
2
5
6
7
3
4