TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
4
1. EXPLANATION OF SYMBOLS AND
SAFETY INSTRUCTIONS
1.1. Explanation of symbols
CAUTION!
-
Important
recommendation or warning
concerning safety conditions
during installation and operation of the
heating boiler
DANGER!
- fault or improper use
may cause injury or be hazardous
to the life of humans or animals.
FIRE HAZARD!
- fault or improper
installation and operation may
cause fire.
INFORMATION
–
Important
information on the proper
operation of the product.
1.2. Requirements to boiler installation
room
This
manual
contains
important
information for the safe and correct
installation, start-up and trouble-free
service and maintenance of the heating
boiler.
The heating boiler can be used for heating
rooms only in the manner described in
this manual.
Take note of the boiler type information
indicated on the factory sticker and the
technical data provided in chapter 11 in
order to ensure proper operation of the
product.
1.2.1. Instructions to boiler installer
During installation and operation, the
country-specific
requirements
and
regulations must be observed:
• local building regulations on the
installation, air supply and exhaust
gas extraction as well as chimney
connection.
• regulations and norms concerning the
fitting of the heating installation with
safety devices.
i
Use only original BURNiT parts
DANGER of intoxication,
suffocation.
Inadequate inflow of fresh air
in the boiler room may result in
dangerous leak of exhaust gases
during boiler operation
.
-
Make sure the air inlets and
exhaust gas outlets are not
clogged or closed
.
-
If faults are not remedied
immediately
,
the boiler must
not be operated
,
and the user
must be provided with written
instructions on the fault and the
hazard it entails
.
!
DANGER of fire when burning
flammable materials or liquids.
-
Flammable
materials
/
liquids
must not be left in immediate
proximity of the heating boiler
.
-
Indicate to the installation user
the allowed minimum clearances
from surrounding objects
.
Customer must undergo boiler
operation/maintenance training
by authorized installer/service
shop.
*
It is mandatory to assure a backup
power generator of corresponding
rated power! (see 12.3)
1.2.2. Instructions to installation user
*
Customer must undergo boiler
operation/maintenance training
by authorized installer/service
shop.
*
It is mandatory to assure a backup
power generator of corresponding
rated power! (see 12.3)
Summary of Contents for Lambda series
Page 2: ......
Page 32: ...TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL TE 32...
Page 34: ......
Page 35: ......