![Burnham SCG Installation & Service Instructions Manual Download Page 66](http://html1.mh-extra.com/html/burnham/scg/scg_installation-and-service-instructions-manual_2832980066.webp)
H.
Operating Instructions
.
1. Follow Operating Instructions to place boiler in
operation. See Figure 36.
2. Electronic Ignition Modules with LED indicators.
Table 10 cross-references the ignition module
terminal designations to the ignition terminal
Figure 7: lED locations
Ignition Module
Terminal Designation
Wiring Ladder Diagram
Terminal Number
MV
1
MV/PV
2
PV
3
GND
4
24V (GND)
5
24V
6
SPARK
9
TABlE 10: IGNITION MODUlE TERMINAl
CROSS-REFERENCE
Yellow LED
Flash Code
a
Indicates
Recommended Service Action
Heartbeat
Normal Flame Signal
N/A
2
Weak Flame Signal -
System will operate reliably but flame signal is
less than desired.
Note
: This indication may flash temporarily
during or shortly after lightoff on some appli-
cations.
Perform routine maintenance to
assure optimum flame signal.
1
Marginal Flame Signal (less than 1.1 µA) -
System may not operate reliably over time.
Service call recommended.
Note
: This indication may flash temporarily
during or shortly after lightoff on some appli-
cations.
Check gas supply, pilot burner, flame
sense wiring, contamination of flame
rod, burner ground connection.
OFF
No Flame or Flame Signal -
below minimum threshold for system
operation.
N/A
a
Flash Code Descriptions
- Heartbeat: Constant ½ second bright, ½ second dim cycles.
- The flash code number signifies that the LED flashes X times at 2Hz, remains off for two
seconds, and then repeats sequence.
numbers in the wiring ladder diagrams. The yellow
LED indicates the status of the flame, see Table 11.
The green LED indicates the status of the system,
see Table 12. See Figure 37 for LED locations. See
Figure 38 for Troubleshooting Guide.
TABlE 11: yEllOW lED FlAME CODES
Summary of Contents for SCG
Page 5: ...Figure 2 Dimensions...
Page 13: ...13 Figure 4A Recommended Separate Horizontal Vent Air Intake Installation...
Page 14: ...14 Figure 4B Alternate Separate Horizontal Vent Air Intake Installation...
Page 15: ...15 Figure 5A Separate Horizontal Vent Air Intake Terminal Configuration SCG 3 thru 7...
Page 16: ...16 Figure 5B Separate Horizontal Vent Air Intake Terminal Configuration SCG 8 and 9...
Page 19: ...19 Figure 7 Attic Offset Figure 6 Vertical Vent Installation...
Page 22: ...22 Figure 9 Vertical Air Intake Piping...
Page 25: ...25 Figure 10 Combination Horizontal Vent Air Installation SCG 3 thru 6...
Page 26: ...26 Figure 11 Combination Horizontal Vent Air Terminal Installation SCG 3 thru 6...
Page 38: ...38 Figure 12 Recommended Separate Horizontal Vent Installation...
Page 39: ...39 Figure 13 Alternate Separate Horizontal Vent Installation...
Page 44: ...44 Figure 22 Optional Separate Horizontal 4 Vent Terminal Installation Indoor Air...
Page 48: ...48 Figure 25 Recommended Water Piping for Circulator Zoned Heating Systems...
Page 49: ...49 Figure 26 Recommended Water Piping for Zone Valve Zoned Heating Systems...
Page 54: ...54 Figure 28 Internal Boiler Wiring Schematic Diagram...
Page 57: ...57 Figure 30 System Wiring Schematic for Single Zone Space Heating Only...
Page 59: ...59 Figure 32 Circulator Zoned System Wiring Schematic...
Page 60: ...60 Figure 33 Zone Valve Zoned System Wiring Schematic...
Page 61: ...61 Figure 34 Different Manufacturer s Zone Valve Connections to Honeywell R8889...
Page 63: ...63 Figure 35 Modular Boiler Gas Piping...
Page 65: ...65 Figure 36 Operating Instructions...
Page 68: ...68 Figure 38 Troubleshooting Guide Honeywell Electronic Ignition Troubleshooting Guide...
Page 73: ...73 Figure 44 Flue and Burner Cleanout 1 Burner...
Page 75: ...75 THIS PAGE LEFT INTENTIONALLY BLANK...
Page 76: ...76...
Page 77: ...77...
Page 80: ...80...
Page 82: ...82...
Page 84: ...84...
Page 86: ...86...
Page 88: ...88...
Page 90: ...90...
Page 94: ...94 SERVICE RECORD DATE SERVICE PERFORMED...