9
• For a venting system that extends through
any zone above that on which the connected
appliance is located (except for one and two
family dwellings), the vent system shall be
enclosed with an enclosure having a fire
resistance rating equal to or greater than that of
the floor or roof assemblies through which it
passes.
• Design any enclosure to permit inspection of the
system.
• Do not place any type of insulation in any
required clearance spaces surrounding the vent
system.
6.
Vertical Installation Requirements:
a.
Seal weather exposed joints of the outer jacket
with foil tape or an exterior grade silicone
sealant.
b. The vent system must terminate at least 3 feet
above the roof line and at least 2 feet higher than
any portion of the building within 10 feet.
c. When terminated at a height of more than 6 feet
the stack must be supported by a support bracing.
The vent should be supported every 10 feet.
d. The total continuous distance of the vent system
from the appliance flue collar to the termination
shall not exceed that specified in the appliance
manufacturer’s installation instructions.
e. In cold climates do not install a condensate drain
on the exterior of the building. Doing so may
result in dangerous icy conditions on surfaces
near the drain and may cause damage to the vent
system and/or the building exterior.
f. Install supports every 10 feet vertically along the
vent pipe route. Vertical supports are required
after every transition to vertical and are required
after every offset elbow. When the vent is free
standing and penetrates a roof/ceiling another
means of support must be used at a second
location. Refer to the Vertical Supports section
in this manual.
Summary of Contents for SCG
Page 5: ...Figure 2 Dimensions...
Page 13: ...13 Figure 4A Recommended Separate Horizontal Vent Air Intake Installation...
Page 14: ...14 Figure 4B Alternate Separate Horizontal Vent Air Intake Installation...
Page 15: ...15 Figure 5A Separate Horizontal Vent Air Intake Terminal Configuration SCG 3 thru 7...
Page 16: ...16 Figure 5B Separate Horizontal Vent Air Intake Terminal Configuration SCG 8 and 9...
Page 19: ...19 Figure 7 Attic Offset Figure 6 Vertical Vent Installation...
Page 22: ...22 Figure 9 Vertical Air Intake Piping...
Page 25: ...25 Figure 10 Combination Horizontal Vent Air Installation SCG 3 thru 6...
Page 26: ...26 Figure 11 Combination Horizontal Vent Air Terminal Installation SCG 3 thru 6...
Page 38: ...38 Figure 12 Recommended Separate Horizontal Vent Installation...
Page 39: ...39 Figure 13 Alternate Separate Horizontal Vent Installation...
Page 44: ...44 Figure 22 Optional Separate Horizontal 4 Vent Terminal Installation Indoor Air...
Page 48: ...48 Figure 25 Recommended Water Piping for Circulator Zoned Heating Systems...
Page 49: ...49 Figure 26 Recommended Water Piping for Zone Valve Zoned Heating Systems...
Page 54: ...54 Figure 28 Internal Boiler Wiring Schematic Diagram...
Page 57: ...57 Figure 30 System Wiring Schematic for Single Zone Space Heating Only...
Page 59: ...59 Figure 32 Circulator Zoned System Wiring Schematic...
Page 60: ...60 Figure 33 Zone Valve Zoned System Wiring Schematic...
Page 61: ...61 Figure 34 Different Manufacturer s Zone Valve Connections to Honeywell R8889...
Page 63: ...63 Figure 35 Modular Boiler Gas Piping...
Page 65: ...65 Figure 36 Operating Instructions...
Page 68: ...68 Figure 38 Troubleshooting Guide Honeywell Electronic Ignition Troubleshooting Guide...
Page 73: ...73 Figure 44 Flue and Burner Cleanout 1 Burner...
Page 75: ...75 THIS PAGE LEFT INTENTIONALLY BLANK...
Page 76: ...76...
Page 77: ...77...
Page 80: ...80...
Page 82: ...82...
Page 84: ...84...
Page 86: ...86...
Page 88: ...88...
Page 90: ...90...
Page 94: ...94 SERVICE RECORD DATE SERVICE PERFORMED...