![Burnham SCG Installation & Service Instructions Manual Download Page 30](http://html1.mh-extra.com/html/burnham/scg/scg_installation-and-service-instructions-manual_2832980030.webp)
0
7.
Joint Assembly Instructions:
a. Before joining the sections or fittings together, use an alcohol pad to wipe the joint area of both ends of the inner
pipe. This will remove any foreign matter which may affect the integrity of the seal. Install the system with the
female ends (ends with the red seal) pointing away from the appliance. (Unless specified differently by the appliance
manufacturer.)
b. Insert the male end of the inner pipe into the female end of the previous section. In extremely dry conditions it may be
helpful to moisten the seal with clean water prior to assembly. Push firmly until the outer jacket has made contact with
the snap ring located inside the female end of the previous section. When fully assembled the outer female end will
overlap the male end 1”.
c. Use the three (3) self-tapping screws provided to connect the outer vents. No pre-drilling is required.
NOTICE
Do not overtighten. If using a variable torque drill, use a low torque setting to install screws, as not to strip
out the holes. If a hole becomes stripped due to overtightening, a larger diameter screw (½” long max.) or
short pot rivet can be used.
Summary of Contents for SCG
Page 5: ...Figure 2 Dimensions...
Page 13: ...13 Figure 4A Recommended Separate Horizontal Vent Air Intake Installation...
Page 14: ...14 Figure 4B Alternate Separate Horizontal Vent Air Intake Installation...
Page 15: ...15 Figure 5A Separate Horizontal Vent Air Intake Terminal Configuration SCG 3 thru 7...
Page 16: ...16 Figure 5B Separate Horizontal Vent Air Intake Terminal Configuration SCG 8 and 9...
Page 19: ...19 Figure 7 Attic Offset Figure 6 Vertical Vent Installation...
Page 22: ...22 Figure 9 Vertical Air Intake Piping...
Page 25: ...25 Figure 10 Combination Horizontal Vent Air Installation SCG 3 thru 6...
Page 26: ...26 Figure 11 Combination Horizontal Vent Air Terminal Installation SCG 3 thru 6...
Page 38: ...38 Figure 12 Recommended Separate Horizontal Vent Installation...
Page 39: ...39 Figure 13 Alternate Separate Horizontal Vent Installation...
Page 44: ...44 Figure 22 Optional Separate Horizontal 4 Vent Terminal Installation Indoor Air...
Page 48: ...48 Figure 25 Recommended Water Piping for Circulator Zoned Heating Systems...
Page 49: ...49 Figure 26 Recommended Water Piping for Zone Valve Zoned Heating Systems...
Page 54: ...54 Figure 28 Internal Boiler Wiring Schematic Diagram...
Page 57: ...57 Figure 30 System Wiring Schematic for Single Zone Space Heating Only...
Page 59: ...59 Figure 32 Circulator Zoned System Wiring Schematic...
Page 60: ...60 Figure 33 Zone Valve Zoned System Wiring Schematic...
Page 61: ...61 Figure 34 Different Manufacturer s Zone Valve Connections to Honeywell R8889...
Page 63: ...63 Figure 35 Modular Boiler Gas Piping...
Page 65: ...65 Figure 36 Operating Instructions...
Page 68: ...68 Figure 38 Troubleshooting Guide Honeywell Electronic Ignition Troubleshooting Guide...
Page 73: ...73 Figure 44 Flue and Burner Cleanout 1 Burner...
Page 75: ...75 THIS PAGE LEFT INTENTIONALLY BLANK...
Page 76: ...76...
Page 77: ...77...
Page 80: ...80...
Page 82: ...82...
Page 84: ...84...
Page 86: ...86...
Page 88: ...88...
Page 90: ...90...
Page 94: ...94 SERVICE RECORD DATE SERVICE PERFORMED...