
68
IX. Service
A.
General.
Inspection and service must be conducted
annually. Turn off electrical power and gas supply
while conducting service or maintenance. Follow
instructions TO TURN OFF GAS TO APPLIANCE.
See Lighting/Operating Instructions on inside of Front
Removable Door.
G
N
I
N
R
A
W
n
e
h
w
n
o
i
t
c
e
n
n
o
c
s
i
d
o
t
r
o
i
r
p
s
e
r
i
w
l
l
a
l
e
b
a
L
e
s
u
a
c
n
a
c
s
r
o
r
r
e
g
n
i
r
i
W
.
s
l
o
r
t
n
o
c
g
n
i
c
i
v
r
e
s
y
f
i
r
e
V
.
n
o
i
t
a
r
e
p
o
s
u
o
r
e
g
n
a
d
d
n
a
r
e
p
o
r
p
m
i
.
g
n
i
c
i
v
r
e
s
r
e
t
f
a
n
o
i
t
a
r
e
p
o
r
e
p
o
r
p
B.
Maintenance of Low Water Cut-off (if used).
Follow
instructions provided with low water cut-off.
C.
Vent System.
Check for:
1. obstructions
2. accumulations of soot
3. deterioration of vent pipe or vent accessories due to
condensation or other reasons
4. proper support—no sags, particularly in horizontal
runs
5. tightness of joints. Remove all accumulations of
soot with wire brush and vacuum
Remove all obstructions. Replace all deteriorated parts
and support properly. Seal all joints.
D.
Remove Main Burners
for cleaning, changing orifice
plugs, or repairs.
1. Shut down gas boiler in accordance with Lighting/
Operating Instructions on inside of Front
Removable Door. Close Manual Shut-off Valve.
2. Remove Front Removable Door. Raise Lower Front
Tie Bar.
3. Disconnect ignition system.
4. Remove burner access panel(s).
5. Mark location of Main Burner with Pilot Bracket on
manifold.
6. Remove hitch pin clips from Main Burner Orifices.
7. Hold Main Burner on throat. Lift slightly to raise rear
of burner. Push to rear of boiler until burner clears
Main Burner Orifice. Lift burners out.
8. Check burners to be sure they do not contain foreign
matter or restrictions. Clean burners with a soft
bristle brush, blow any dirt out with compressed air
or use a vacuum cleaner. See Figure 60.
E.
Clean Boiler Flueways.
1. Shut down gas boiler in accordance with Lighting/
Operating Instructions on inside of Front
Removable Door. Close Manual Shut-off Valve.
2. Disconnect vent system. Remove Draft Hood.
3. Remove Jacket Top Panel.
4. Remove Canopy from top of boiler.
5. Thoroughly clean flueways with flue brush,
removing all scale and soot. See Figure 60.
6. Clean boiler heating surface accessible from
combustion chamber with straight handle wire
brush.
7. Install Canopy. See Section II: Boiler Assembly,
Paragraph G.
8. Install Jacket Top Panel, Draft Hood, Vent Damper
(if used) and Vent System.
G
N
I
N
R
A
W
a
m
o
r
f
l
e
n
n
o
s
r
e
p
d
e
l
l
i
k
s
d
n
a
d
e
n
i
a
r
t
y
b
y
l
n
o
n
e
k
a
t
r
e
d
n
u
e
b
d
l
u
o
h
s
r
e
l
i
o
b
s
i
h
t
n
o
e
c
i
v
r
e
S
s
i
h
t
n
i
d
e
i
f
i
c
e
p
s
s
l
a
v
r
e
t
n
i
t
a
d
e
m
r
o
f
r
e
p
e
b
d
l
u
o
h
s
s
n
o
i
t
c
e
p
s
n
I
.
y
c
n
e
g
a
e
c
i
v
r
e
s
d
e
i
f
i
l
a
u
q
.
n
o
i
t
i
d
n
o
c
e
l
b
i
g
e
l
a
n
i
l
a
u
n
a
m
n
i
a
t
n
i
a
M
.
l
a
u
n
a
m
e
l
b
a
m
m
a
l
f
r
e
h
t
o
d
n
a
e
n
i
l
o
s
a
g
,
s
l
a
i
r
e
t
a
m
e
l
b
i
t
s
u
b
m
o
c
f
o
e
e
r
f
d
n
a
r
a
e
l
c
a
e
r
a
r
e
l
i
o
b
p
e
e
K
.
s
d
i
u
q
i
l
d
n
a
s
r
o
p
a
v
d
n
a
n
o
i
t
s
u
b
m
o
c
f
o
w
o
l
f
r
e
d
n
i
h
l
l
i
w
t
a
h
t
m
o
o
r
r
e
l
i
o
b
n
i
s
n
o
i
t
c
u
r
t
s
b
o
y
n
a
e
c
a
l
p
t
o
n
o
D
.
r
i
a
n
o
i
t
a
l
i
t
n
e
v
s
n
o
i
t
c
u
r
t
s
n
i
e
h
t
o
t
n
o
i
t
i
d
d
a
n
i
e
r
a
l
a
u
n
a
m
s
i
h
t
n
i
d
e
n
i
a
t
n
o
c
s
n
o
i
t
c
u
r
t
s
n
i
e
c
i
v
r
e
s
e
h
T
s
'
r
e
r
u
t
c
a
f
u
n
a
m
t
n
e
n
o
p
m
o
c
w
o
l
l
o
F
.
s
t
n
e
n
o
p
m
o
c
r
e
l
i
o
b
e
h
t
f
o
r
e
r
u
t
c
a
f
u
n
a
m
e
h
t
y
b
d
e
d
i
v
o
r
p
.
r
e
l
i
o
b
e
h
t
h
t
i
w
d
e
d
i
v
o
r
p
e
r
e
w
s
n
o
i
t
c
u
r
t
s
n
i
s
'
r
e
r
u
t
c
a
f
u
n
a
m
t
n
e
n
o
p
m
o
C
.
s
n
o
i
t
c
u
r
t
s
n
i
,
l
l
a
t
s
n
i
t
o
n
o
D
.
g
n
i
s
s
i
m
e
r
a
s
n
o
i
t
c
u
r
t
s
n
i
f
i
t
n
e
m
e
c
a
l
p
e
r
r
o
f
r
e
r
u
t
c
a
f
u
n
a
m
t
n
e
n
o
p
m
o
c
t
c
a
t
n
o
C
f
o
l
l
a
g
n
i
d
n
a
t
s
r
e
d
n
u
d
n
a
g
n
i
d
a
e
r
t
u
o
h
t
i
w
r
e
l
i
o
b
s
i
h
t
e
c
i
v
r
e
s
r
o
n
i
a
t
n
i
a
m
,
e
t
a
r
e
p
o
,
p
u
t
r
a
t
s
d
e
t
c
e
n
n
o
c
s
i
d
,
d
e
r
e
t
l
a
h
t
i
w
e
t
a
r
e
p
o
o
t
r
e
l
i
o
b
e
h
t
w
o
l
l
a
t
o
n
o
D
.
s
n
o
i
t
c
u
r
t
s
n
i
t
n
e
n
o
p
m
o
c
e
h
t
y
l
l
a
n
i
g
i
r
o
e
s
o
h
t
o
t
l
a
c
i
t
n
e
d
i
s
t
n
e
n
o
p
m
o
c
t
n
e
m
e
c
a
l
p
e
r
e
s
u
y
l
n
O
.
s
t
n
e
n
o
p
m
o
c
d
e
r
e
p
m
u
j
r
o
.
m
a
h
n
r
u
B
y
b
d
e
i
l
p
p
u
s
Summary of Contents for 805B
Page 13: ...13 Figure 8 Jacket Assembly...
Page 14: ...14 Figure 9 EP OP Control Installation...
Page 17: ...17 Figure 10 Schematic Gas Piping 24V Standing Pilot 806B 807B...
Page 18: ...18 Figure 11 Main Gas Piping Intermittent Ignition EI...
Page 19: ...19 Figure 12 Schematic Pilot Piping Honeywell EI USA...
Page 20: ...20 Figure 13 Schematic Pilot Piping Honeywell EI Canada Natural Gas 805B 810B LP Gas 806B 807B...
Page 21: ...21 Figure 14 Schematic Pilot Piping Johnson EI USA...
Page 22: ...22 Figure 15 Schematic Pilot Piping Johnson EI Canada Natural Gas 805B 810B LP Gas 806B 807B...
Page 23: ...23 Figure 16 Schematic Gas Piping OP Control System 806B 810B...
Page 24: ...24 Figure 17 Schematic Gas Piping OP CSD 1 Control System 808B 810B...
Page 25: ...25 Figure 18 Schematic Gas Piping EP Control System Natural Gas Only 806B 810B...
Page 26: ...26 Figure 19 Schematic Gas Piping EP CSD 1 Control System 808B 810B...
Page 30: ...30 Figure 25 Recommended Boiler Piping for Circulator Zoned Heating Systems...
Page 39: ...39 Figure 31 Wiring Diagram Standing Pilot 24 USA and Canada Continuous Circulation...
Page 40: ...40 Figure 32 Wiring Diagram Standing Pilot 24V USA and Canada Intermittent Circulation...
Page 42: ...42 Figure 33 Wiring Diagram OP OP CSD 1 Ignition System Continuous Circulation...
Page 43: ...43 Figure 34 Wiring Diagram OP OP CSD 1 Ignition System Intermittent Circulation...
Page 45: ...45 Figure 35 Wiring Diagram Honeywell EI USA Continuous Circulation...
Page 46: ...46 Figure 36 Wiring Diagram Honeywell EI USA Intermittent Circulation...
Page 47: ...47 Figure 37 Wiring Diagram Honeywell EI Canada Continuous Circulation...
Page 48: ...48 Figure 38 Wiring Diagram Honeywell EI Canada Intermittent Circulation...
Page 50: ...50 Figure 39 Wiring Diagram Johnson EI USA Continuous Circulation...
Page 51: ...51 Figure 40 Wiring Diagram Johnson EI USA Intermittent Circulation...
Page 52: ...52 Figure 41 Wiring diagram Johnson EI Canada Continuous Circulation...
Page 53: ...53 Figure 42 Wiring Diagram Johnson EI Canada Intermittent Circulation...
Page 55: ...55 Figure 43 Wiring Diagram EP EP CSD 1 Ignition System USA Continuous Circulation...
Page 56: ...56 Figure 44 Wiring Diagram EP EP CSD 1 Ignition System USA Intermittent Circulation...
Page 60: ...60 Figure 49 Lighting Instructions 24V Standing Pilot...
Page 61: ...61 Figure 50 Operating Instructions EI...
Page 62: ...62 Figure 51 Lighting Instructions OP...
Page 63: ...63 Figure 52 Operating Instructions EP...
Page 71: ...71 Honeywell EI Trouble Shooting Guide...
Page 72: ...72 Johnson EI Trouble Shooting Guide...
Page 73: ...73...
Page 74: ...74 SERVICE RECORD DATE SERVICE PERFORMED...
Page 94: ...94...
Page 97: ...97...