36
VII. Electrical
A.
Install Boiler Wiring
1. Knockdown boilers only. Locate wiring harnesses in
Combination Boiler Parts and Control Carton. Refer
to Table 10 and connect wiring as shown on the
appropriate wiring diagram.
2. Connect supply wiring and electrically ground boiler
in accordance with requirements of authority having
jurisdiction, or in absence of such requirements the
National Electrical Code
, ANSI/NFPA 70 and/or
CSA C22.1 Electrical Code.
B.
Wire Vent Damper
(if used; required on 805, optional
on 806-810). See Figure 28.
1. Attach Vent Damper Harness to mounting hole in
Jacket Left Side Panel. Install Cable Clamp around
flexible conduit and attach to Jacket Top Panel.
Figure 30: Vent Damper Schematic Wiring Diagram
R
E
G
N
A
D
e
c
i
v
r
e
s
r
o
n
o
i
t
a
l
l
a
t
s
n
i
g
n
i
t
p
m
e
t
t
a
e
r
o
f
e
b
d
e
r
e
w
o
p
n
u
e
r
a
s
n
o
i
t
c
e
n
n
o
c
l
a
c
i
r
t
c
e
l
e
l
l
a
e
r
u
s
s
a
y
l
e
v
i
t
i
s
o
P
s
e
x
o
b
l
a
c
i
r
t
c
e
l
e
l
l
a
t
u
o
k
c
o
L
.
g
n
i
d
l
i
u
b
r
o
r
e
l
i
o
b
e
h
t
f
o
s
n
o
i
t
c
e
n
n
o
c
r
o
s
t
n
e
n
o
p
m
o
c
l
a
c
i
r
t
c
e
l
e
f
o
.
f
f
o
d
e
n
r
u
t
s
i
r
e
w
o
p
e
c
n
o
k
c
o
l
d
a
p
h
t
i
w
G
N
I
N
R
A
W
l
a
c
i
s
y
h
p
s
u
o
i
r
e
s
n
i
t
l
u
s
e
r
y
a
m
r
e
l
i
o
b
e
h
t
o
t
s
n
o
i
t
c
e
n
n
o
c
l
a
c
i
r
t
c
e
l
e
e
r
i
w
y
l
r
e
p
o
r
p
o
t
e
r
u
l
i
a
F
.
m
r
a
h
e
r
o
f
e
b
f
f
o
s
i
r
e
w
o
p
l
l
a
e
r
u
s
e
k
a
M
.
e
c
r
u
o
s
e
n
o
n
a
h
t
e
r
o
m
m
o
r
f
e
b
y
a
m
r
e
w
o
p
l
a
c
i
r
t
c
e
l
E
.
k
r
o
w
l
a
c
i
r
t
c
e
l
e
y
n
a
g
n
i
t
p
m
e
t
t
a
.
t
c
e
n
n
o
c
s
i
d
d
e
s
u
f
d
e
z
i
s
y
l
r
e
p
o
r
p
a
h
t
i
w
d
e
t
c
e
t
o
r
p
e
b
t
s
u
m
r
e
l
i
o
b
h
c
a
E
.
s
l
o
r
t
n
o
c
g
n
i
t
a
r
e
p
o
r
o
y
t
e
f
a
s
y
n
a
e
v
i
t
a
r
e
p
o
n
i
e
k
a
m
r
o
t
u
o
p
m
u
j
r
e
v
e
N
r
e
l
i
o
b
h
c
a
E
.
y
l
n
o
s
e
s
o
p
r
u
p
e
c
n
e
r
e
f
e
r
r
o
f
e
r
a
l
a
u
n
a
m
s
i
h
t
n
i
d
e
n
i
a
t
n
o
c
s
m
a
r
g
a
i
d
g
n
i
r
i
w
e
h
T
e
h
t
d
n
a
m
a
r
g
a
i
d
s
i
h
t
o
t
r
e
f
e
R
.
r
o
o
d
t
n
o
r
f
e
h
t
o
t
d
e
h
c
a
t
t
a
m
a
r
g
a
i
d
g
n
i
r
i
w
a
h
t
i
w
d
e
p
p
i
h
s
s
i
g
n
i
r
i
w
l
l
a
w
o
l
l
o
f
d
n
a
d
n
a
t
s
r
e
d
n
u
,
d
a
e
R
.
r
e
l
i
o
b
e
h
t
h
t
i
w
d
e
s
u
s
l
o
r
t
n
o
c
y
n
a
f
o
m
a
r
g
a
i
d
g
n
i
r
i
w
.
s
l
o
r
t
n
o
c
e
h
t
h
t
i
w
d
e
i
l
p
p
u
s
s
n
o
i
t
c
u
r
t
s
n
i
2. Remove factory installed Jumper Plug from Vent
Damper Receptacle on Vestibule Wiring Harness
and discard.
3. Plug Vent Damper Harness Plug into Vent Damper
Receptacle. See Figure 28.
C.
Install thermostat.
Locate on inside wall approximately
4 feet above floor. Do not install on outside wall, near
fireplace, or where influenced by drafts or restricted air
flow, hot or cold pipes, lighting fixtures, television, or
sunlight. Allow free air movement by avoiding
placement of furniture near thermostat.
Set heat anticipator to match control system
requirements. Refer to Table 9.
D.
Wire thermostat.
Provide Class II circuit between
thermostat and boiler. Refer to appropriate wiring
diagram for control system being used.
Summary of Contents for 805B
Page 13: ...13 Figure 8 Jacket Assembly...
Page 14: ...14 Figure 9 EP OP Control Installation...
Page 17: ...17 Figure 10 Schematic Gas Piping 24V Standing Pilot 806B 807B...
Page 18: ...18 Figure 11 Main Gas Piping Intermittent Ignition EI...
Page 19: ...19 Figure 12 Schematic Pilot Piping Honeywell EI USA...
Page 20: ...20 Figure 13 Schematic Pilot Piping Honeywell EI Canada Natural Gas 805B 810B LP Gas 806B 807B...
Page 21: ...21 Figure 14 Schematic Pilot Piping Johnson EI USA...
Page 22: ...22 Figure 15 Schematic Pilot Piping Johnson EI Canada Natural Gas 805B 810B LP Gas 806B 807B...
Page 23: ...23 Figure 16 Schematic Gas Piping OP Control System 806B 810B...
Page 24: ...24 Figure 17 Schematic Gas Piping OP CSD 1 Control System 808B 810B...
Page 25: ...25 Figure 18 Schematic Gas Piping EP Control System Natural Gas Only 806B 810B...
Page 26: ...26 Figure 19 Schematic Gas Piping EP CSD 1 Control System 808B 810B...
Page 30: ...30 Figure 25 Recommended Boiler Piping for Circulator Zoned Heating Systems...
Page 39: ...39 Figure 31 Wiring Diagram Standing Pilot 24 USA and Canada Continuous Circulation...
Page 40: ...40 Figure 32 Wiring Diagram Standing Pilot 24V USA and Canada Intermittent Circulation...
Page 42: ...42 Figure 33 Wiring Diagram OP OP CSD 1 Ignition System Continuous Circulation...
Page 43: ...43 Figure 34 Wiring Diagram OP OP CSD 1 Ignition System Intermittent Circulation...
Page 45: ...45 Figure 35 Wiring Diagram Honeywell EI USA Continuous Circulation...
Page 46: ...46 Figure 36 Wiring Diagram Honeywell EI USA Intermittent Circulation...
Page 47: ...47 Figure 37 Wiring Diagram Honeywell EI Canada Continuous Circulation...
Page 48: ...48 Figure 38 Wiring Diagram Honeywell EI Canada Intermittent Circulation...
Page 50: ...50 Figure 39 Wiring Diagram Johnson EI USA Continuous Circulation...
Page 51: ...51 Figure 40 Wiring Diagram Johnson EI USA Intermittent Circulation...
Page 52: ...52 Figure 41 Wiring diagram Johnson EI Canada Continuous Circulation...
Page 53: ...53 Figure 42 Wiring Diagram Johnson EI Canada Intermittent Circulation...
Page 55: ...55 Figure 43 Wiring Diagram EP EP CSD 1 Ignition System USA Continuous Circulation...
Page 56: ...56 Figure 44 Wiring Diagram EP EP CSD 1 Ignition System USA Intermittent Circulation...
Page 60: ...60 Figure 49 Lighting Instructions 24V Standing Pilot...
Page 61: ...61 Figure 50 Operating Instructions EI...
Page 62: ...62 Figure 51 Lighting Instructions OP...
Page 63: ...63 Figure 52 Operating Instructions EP...
Page 71: ...71 Honeywell EI Trouble Shooting Guide...
Page 72: ...72 Johnson EI Trouble Shooting Guide...
Page 73: ...73...
Page 74: ...74 SERVICE RECORD DATE SERVICE PERFORMED...
Page 94: ...94...
Page 97: ...97...