
67
Table 12: Input Rate
b. Increase input rate if less than 98% of rating plate
input. Increase manifold gas pressure no more
than 0.3 inch w.c. If measured input rate is still
less than 98% of rated input:
i.
Remove Main Burners per procedure in
Section IX: Service.
ii. Remove gas orifices. Drill one (1) drill size
larger (drill size is stamped on orifice, or
see Key No. 4E).
iii. Reinstall gas orifices and main burners.
Measure input rate.
6. Recheck Main Burner Flame.
7. Return other gas-fired appliances to previous
conditions of use.
N.
Adjust gas input rate to boiler.
LP/Propane.
1. Set thermostat to highest setting.
2. Adjust tank regulator for gas valve inlet pressure of
13.5 inches w.c. or less.
3. Gas valve has step opening regulator which initially
opens to 1.4 or 2.5 inch w.c. and steps to full
pressure after approximately 30 seconds. Check
manifold pressure after step has occurred. Adjust
gas valve pressure regulator as necessary for 10.0
inches w.c. (turn adjustment screw
counterclockwise to decrease manifold pressure, or
clockwise to increase manifold pressure). If 10.0
inches w.c. can not be attained, check gas valve
inlet pressure. If less than 11.0 inches w.c., contact
gas supplier for assistance.
O.
Clean Heating System
Oil, grease, and other foreign materials which
accumulate in new hot water boilers and a new or
reworked system should be boiled out, and then
thoroughly flushed. A qualified water treatment
chemical specialist should be consulted for
recommendations regarding appropriate chemical
compounds and concentrations which are compatible
with local environmental regulations.
P.
Check Damper Operation
- If boiler is equipped with
vent damper, vent damper must be in open position
when boiler main burners are operating. Start boiler,
refer to instructions on damper to determine if damper
is in full open position.
Q.
Install Front Removable Panel.
1. Engage top flange (longer of 2 flanges) behind
Upper Front Panel.
2. Swing lower portion of door toward boiler.
3. Lower door to engage bottom flange behind Lower
Front Tie Bar.
s
d
n
o
c
e
S
e
n
O
r
o
f
n
o
i
t
u
l
o
v
e
R
l
a
i
D
r
e
t
e
M
s
a
G
f
o
e
z
i
S
f
l
a
H
-
e
n
O
.
t
F
.
u
C
e
n
O
.
t
F
.
u
C
o
w
T
.
t
F
.
u
C
e
v
i
F
.
t
F
.
u
C
0
3
0
6
0
2
1
0
4
2
0
0
6
2
3
6
5
3
1
1
5
2
2
3
6
5
4
3
3
5
6
0
1
2
1
2
9
2
5
6
3
0
5
0
0
1
0
0
2
0
0
5
8
3
7
4
5
9
9
8
1
4
7
4
0
4
5
4
0
9
0
8
1
0
5
4
2
4
3
4
6
8
2
7
1
0
3
4
4
4
1
4
2
8
4
6
1
0
1
4
6
4
9
3
8
7
7
5
1
1
9
3
8
4
7
3
5
7
0
5
1
5
7
3
0
5
6
3
2
7
4
4
1
0
6
3
2
5
5
3
9
6
8
3
1
6
4
3
4
5
3
3
7
6
3
3
1
3
3
3
6
5
2
3
4
6
9
2
1
1
2
3
8
5
1
3
2
6
4
2
1
0
1
3
0
6
0
3
0
6
0
2
1
0
0
3
2
6
9
2
8
5
6
1
1
0
9
2
4
6
9
2
6
5
2
1
1
1
8
2
6
6
9
2
4
5
9
0
1
3
7
2
8
6
8
2
3
5
6
0
1
5
6
2
0
7
6
2
1
5
3
0
1
7
5
2
2
7
5
2
0
5
0
0
1
0
5
2
4
7
4
2
8
4
7
9
3
4
2
6
7
4
2
7
4
5
9
7
3
2
8
7
3
2
6
4
2
9
1
3
2
0
8
2
2
5
4
0
9
5
2
2
R.
Combustion Chamber Burn-Off
1. The mineral wool combustion chamber panels
contain a cornstarch based binder that must be
burned out at installation to prevent odors during
subsequent boiler operation.
2. Ventilate the boiler room, set the high limit to its
maximum setting, set the thermostat to call for
heat.
3. Allow the boiler to fire for at least an hour or until
the odor from the cornstarch has dissipated.
4. Return the high limit and thermostat to their
desired settings.
S.
Review User's Information Manual
and system
operation with owner or operator.
Summary of Contents for 805B
Page 13: ...13 Figure 8 Jacket Assembly...
Page 14: ...14 Figure 9 EP OP Control Installation...
Page 17: ...17 Figure 10 Schematic Gas Piping 24V Standing Pilot 806B 807B...
Page 18: ...18 Figure 11 Main Gas Piping Intermittent Ignition EI...
Page 19: ...19 Figure 12 Schematic Pilot Piping Honeywell EI USA...
Page 20: ...20 Figure 13 Schematic Pilot Piping Honeywell EI Canada Natural Gas 805B 810B LP Gas 806B 807B...
Page 21: ...21 Figure 14 Schematic Pilot Piping Johnson EI USA...
Page 22: ...22 Figure 15 Schematic Pilot Piping Johnson EI Canada Natural Gas 805B 810B LP Gas 806B 807B...
Page 23: ...23 Figure 16 Schematic Gas Piping OP Control System 806B 810B...
Page 24: ...24 Figure 17 Schematic Gas Piping OP CSD 1 Control System 808B 810B...
Page 25: ...25 Figure 18 Schematic Gas Piping EP Control System Natural Gas Only 806B 810B...
Page 26: ...26 Figure 19 Schematic Gas Piping EP CSD 1 Control System 808B 810B...
Page 30: ...30 Figure 25 Recommended Boiler Piping for Circulator Zoned Heating Systems...
Page 39: ...39 Figure 31 Wiring Diagram Standing Pilot 24 USA and Canada Continuous Circulation...
Page 40: ...40 Figure 32 Wiring Diagram Standing Pilot 24V USA and Canada Intermittent Circulation...
Page 42: ...42 Figure 33 Wiring Diagram OP OP CSD 1 Ignition System Continuous Circulation...
Page 43: ...43 Figure 34 Wiring Diagram OP OP CSD 1 Ignition System Intermittent Circulation...
Page 45: ...45 Figure 35 Wiring Diagram Honeywell EI USA Continuous Circulation...
Page 46: ...46 Figure 36 Wiring Diagram Honeywell EI USA Intermittent Circulation...
Page 47: ...47 Figure 37 Wiring Diagram Honeywell EI Canada Continuous Circulation...
Page 48: ...48 Figure 38 Wiring Diagram Honeywell EI Canada Intermittent Circulation...
Page 50: ...50 Figure 39 Wiring Diagram Johnson EI USA Continuous Circulation...
Page 51: ...51 Figure 40 Wiring Diagram Johnson EI USA Intermittent Circulation...
Page 52: ...52 Figure 41 Wiring diagram Johnson EI Canada Continuous Circulation...
Page 53: ...53 Figure 42 Wiring Diagram Johnson EI Canada Intermittent Circulation...
Page 55: ...55 Figure 43 Wiring Diagram EP EP CSD 1 Ignition System USA Continuous Circulation...
Page 56: ...56 Figure 44 Wiring Diagram EP EP CSD 1 Ignition System USA Intermittent Circulation...
Page 60: ...60 Figure 49 Lighting Instructions 24V Standing Pilot...
Page 61: ...61 Figure 50 Operating Instructions EI...
Page 62: ...62 Figure 51 Lighting Instructions OP...
Page 63: ...63 Figure 52 Operating Instructions EP...
Page 71: ...71 Honeywell EI Trouble Shooting Guide...
Page 72: ...72 Johnson EI Trouble Shooting Guide...
Page 73: ...73...
Page 74: ...74 SERVICE RECORD DATE SERVICE PERFORMED...
Page 94: ...94...
Page 97: ...97...