7. Attach Lower Front Tie Bar to Left Side and Right
Side Panels.
8. Engage Upper Front Panel in slots on Left Side and
Right Side Panels. Place Top Panel in position.
Attach Top Panel to Left Side, Right Side and
Upper Rear Panels.
9. Tighten all jacket screws.
10. Affix Lighting/Operating Instructions Label and
Wiring Diagram Label to inside of Front
Removable Door. Labels are located in
Combination Boiler Parts and Control Carton.
O.
Install Junction Box
. See Figure 8. Attach junction
box to inside of Left Side Panel with ¼" - 20 x ¼" lg.
machine screw (located in Combination Boiler Parts
and Control Carton).
P.
Install Limit Control.
Locate limit in Combination
Boiler Parts and Control Carton. Insert limit probe into
left immersion well as far as possible. Tighten set
screw.
Q.
Install Auxiliary Limit
or operating control (if used).
Insert control probe into right immersion well as far as
possible. Tighten set screw.
R.
Install Gas Control Assembly.
Refer to Section III,
Gas Control System Assembly (Knockdown Boilers).
S.
EP and OP System: See Figure 9.
1. Install pre-wired EP/OP Control Cabinet Assembly
to right front corner of jacket top panel.
2. Install Honeywell RM7890 Control (located in
RM7890 Control Carton).
3.
EP Only
: Remove RM7890's Dust Cover. With a
pair of side cutters, carefully snip both wire leads to
the brown resistor labelled "JR2" and discard it.
Replace Dust Cover.
4. Install Honeywell R7847 Flame Amplifier.
5. Install heat shield.
1. Cut insulation from semicircular notch at right end of
the burner access panel. Models 808B - 810B have
two (2) burner access panels. Remove insulation
from notch of right side burner access panel only.
2. Attach Flame Roll-out Switch Mounting Bracket to
burner access panel with (1) #8 x ½" lg. sheet metal
screw.
3. Attach Flame Roll-out Switch to mounting bracket
with (1) #8 x ¾" lg. sheet metal screw.
L.
Install Burner Access Panel(s).
Locate Burner
Access Panel(s) in Combination Boiler Parts and
Control Carton. Engage Burner Access Panel holes
with projections on Base Front Panel. See Figure 6.
M.
Install Immersion Well(s).
1. Remove Immersion Well(s) from Combination
Boiler Parts and Control Carton..
2. Insert Immersion Well in Tapping D. See Figure 3.
3. If second limit or operating control is used, insert
immersion well in Tapping E. If vertical gas
piping is to be installed inside of boiler jacket, it is
recommended that second limit be installed in
system piping.
N.
Install Jacket.
See Figure 8.
1. Locate four (4) Jacket Attachment Brackets in
Combination Boiler Parts and Control Carton.
Attach to Front Base Panel and Rear Base Panels
with #8 sheet metal screws. See Figure 5.
2. Hang Left Side Panel and Right Side Panel onto
Jacket Attachment Brackets.
3. Attach Lower Rear Panel to Left and Right Side
Panels. Do not tighten sheet metal screws.
4. Attach Upper Rear Panel to Lower Rear Panel. Do
not install three (3) upper screws.
5. Remove Rating Label and Combustible Clearance
Label from Combination Boiler Parts and Control
Carton. Attach to Vestibule Panel in locations
shown.
6. Attach Vestibule Panel to Left Side and Right Side
Panels.
Summary of Contents for 805B
Page 13: ...13 Figure 8 Jacket Assembly...
Page 14: ...14 Figure 9 EP OP Control Installation...
Page 17: ...17 Figure 10 Schematic Gas Piping 24V Standing Pilot 806B 807B...
Page 18: ...18 Figure 11 Main Gas Piping Intermittent Ignition EI...
Page 19: ...19 Figure 12 Schematic Pilot Piping Honeywell EI USA...
Page 20: ...20 Figure 13 Schematic Pilot Piping Honeywell EI Canada Natural Gas 805B 810B LP Gas 806B 807B...
Page 21: ...21 Figure 14 Schematic Pilot Piping Johnson EI USA...
Page 22: ...22 Figure 15 Schematic Pilot Piping Johnson EI Canada Natural Gas 805B 810B LP Gas 806B 807B...
Page 23: ...23 Figure 16 Schematic Gas Piping OP Control System 806B 810B...
Page 24: ...24 Figure 17 Schematic Gas Piping OP CSD 1 Control System 808B 810B...
Page 25: ...25 Figure 18 Schematic Gas Piping EP Control System Natural Gas Only 806B 810B...
Page 26: ...26 Figure 19 Schematic Gas Piping EP CSD 1 Control System 808B 810B...
Page 30: ...30 Figure 25 Recommended Boiler Piping for Circulator Zoned Heating Systems...
Page 39: ...39 Figure 31 Wiring Diagram Standing Pilot 24 USA and Canada Continuous Circulation...
Page 40: ...40 Figure 32 Wiring Diagram Standing Pilot 24V USA and Canada Intermittent Circulation...
Page 42: ...42 Figure 33 Wiring Diagram OP OP CSD 1 Ignition System Continuous Circulation...
Page 43: ...43 Figure 34 Wiring Diagram OP OP CSD 1 Ignition System Intermittent Circulation...
Page 45: ...45 Figure 35 Wiring Diagram Honeywell EI USA Continuous Circulation...
Page 46: ...46 Figure 36 Wiring Diagram Honeywell EI USA Intermittent Circulation...
Page 47: ...47 Figure 37 Wiring Diagram Honeywell EI Canada Continuous Circulation...
Page 48: ...48 Figure 38 Wiring Diagram Honeywell EI Canada Intermittent Circulation...
Page 50: ...50 Figure 39 Wiring Diagram Johnson EI USA Continuous Circulation...
Page 51: ...51 Figure 40 Wiring Diagram Johnson EI USA Intermittent Circulation...
Page 52: ...52 Figure 41 Wiring diagram Johnson EI Canada Continuous Circulation...
Page 53: ...53 Figure 42 Wiring Diagram Johnson EI Canada Intermittent Circulation...
Page 55: ...55 Figure 43 Wiring Diagram EP EP CSD 1 Ignition System USA Continuous Circulation...
Page 56: ...56 Figure 44 Wiring Diagram EP EP CSD 1 Ignition System USA Intermittent Circulation...
Page 60: ...60 Figure 49 Lighting Instructions 24V Standing Pilot...
Page 61: ...61 Figure 50 Operating Instructions EI...
Page 62: ...62 Figure 51 Lighting Instructions OP...
Page 63: ...63 Figure 52 Operating Instructions EP...
Page 71: ...71 Honeywell EI Trouble Shooting Guide...
Page 72: ...72 Johnson EI Trouble Shooting Guide...
Page 73: ...73...
Page 74: ...74 SERVICE RECORD DATE SERVICE PERFORMED...
Page 94: ...94...
Page 97: ...97...