6
I. Pre-Installation
a. Front: 18"
b. Top: 36"
c. Draft hood, rear, sides and flue connector: 6"
2. USA, 808B-810B: for installation in room which is
large in comparison with size of boiler.
a. Front: 18"
b. Top: 51½"
c. Draft hood, rear, sides, and flue connector: 6"
3. Canada, 805B-810B:
a. Top and front: 18" (45.7cm)
b. Flue, rear and sides: 6" (15.2cm)
D.
Provide clearance for servicing
and proper operation
(following clearances are recommended and may be
reduced to minimum clearances shown above):
1. Single boiler, 805B-807B, Front/Top: 24" (61cm)
2. Single boiler, 808B-810B, Front/Top: 48" (122cm)
3. Multiple/modular boiler, USA/Canada, Sides:
1" (2.5cm)
E.
Install boiler on level floor
as close to chimney as
possible. For basement installation provide a solid base
such as concrete or masonry construction if floor is not
level or if water may be encountered on floor around
boiler.
F.
Protect gas ignition system components
from water
(dripping, spraying, rain, etc.) during boiler operation
and service (circulator replacement, control
replacement, etc.).
G.
Provide combustion and ventilation air
in
accordance with applicable provisions of local building
codes, or the
National Fuel Gas Code
, NFPA 54/ANSI
Z223.1, Section 5.3, Air for Combustion and
Ventilation; or CAN/CGA B149 Installation Codes,
Part 5, Venting Systems and Air Supply for
Appliances.
A.
Inspect shipment
carefully for any signs of damage.
All equipment is carefully manufactured, inspected and
packed. Our responsibility ceases upon delivery of
boiler to carrier in good condition. Any claim for
damage or shortage in shipment must be filed
immediately against carrier by consignee. No claims
for variances or shortages will be allowed by Boiler
Manufacturer, unless presented within sixty (60) days
after receipt of equipment.
B.
Installation must conform
to the requirements of the
authority having jurisdiction. In the absence of such
requirements, installation must conform to the
National Fuel Gas Code
, NFPA 54/ANSI Z223.1 and/
or CAN/CGA B149 Installation Codes. Where
required by the authority having jurisdiction, the
installation must conform to the
Standard for Controls
and Safety Devices for Automatically Fired Boilers
,
ANSI/ASME No. CSD-1.
C.
Provide clearance between combustible material
and boiler jacket (following clearances are minimums):
1. USA, 805B-807B: listed for Alcove installation
Table 2: Special Base Required for Installation on
Combustible Flooring
The following guideline is based on the
National Fuel
Gas Code
, NFPA 54/ANSI Z223.1.
1. Determine volume of space (boiler room). Rooms
communicating directly with space (through
permanent openings not furnished with doors) are
considered part of space.
Volume [ft³] = Length [ft] x Width [ft] x Height [ft]
2. Determine Total Input of all appliances in space.
Round result to nearest 1,000 Btu per hour (Btuh).
3. Determine type of space. Divide Volume by Total
Input.
G
N
I
N
R
A
W
n
o
i
t
a
l
l
a
t
s
n
i
r
o
f
d
e
i
f
i
t
r
e
c
n
g
i
s
e
d
s
i
e
c
n
a
i
l
p
p
A
r
o
F
.
y
l
n
o
g
n
i
r
o
o
l
f
e
l
b
i
t
s
u
b
m
o
c
n
o
n
n
o
y
l
n
o
g
n
i
r
o
o
l
f
e
l
b
i
t
s
u
b
m
o
c
n
o
n
o
i
t
a
l
l
a
t
s
n
i
e
l
b
a
T
n
i
d
e
t
s
i
l
e
s
a
b
l
a
i
c
e
p
s
n
o
d
e
l
l
a
t
s
n
i
n
e
h
w
.
g
n
i
t
e
p
r
a
c
n
o
d
e
l
l
a
t
s
n
i
e
b
t
o
n
t
s
u
m
r
e
l
i
o
B
.
2
s
i
h
c
i
h
w
e
t
e
r
c
n
o
c
n
o
d
e
l
l
a
t
s
n
i
s
i
r
e
l
i
o
b
n
e
h
W
g
n
i
t
l
e
m
o
t
t
c
e
j
b
u
s
s
i
t
a
h
t
l
a
i
r
e
t
a
m
a
r
e
v
o
l
a
i
c
e
p
s
e
h
t
,
)
.
c
t
e
,
g
n
i
b
u
t
t
n
a
i
d
a
r
X
E
P
,
C
V
P
(
t
o
n
s
i
d
a
p
e
t
e
r
c
n
o
c
A
.
d
e
s
u
e
b
t
s
u
m
e
s
a
b
.
g
n
i
r
o
o
l
f
e
l
b
i
t
s
u
b
m
o
c
t
c
e
t
o
r
p
o
t
t
n
e
i
c
i
f
f
u
s
G
N
I
N
R
A
W
e
r
o
f
e
b
s
n
o
i
t
c
u
r
t
s
n
i
l
l
a
d
a
e
r
y
l
l
u
f
e
r
a
C
l
l
a
w
o
l
l
o
f
o
t
e
r
u
l
i
a
F
.
r
e
l
i
o
b
g
n
i
l
l
a
t
s
n
i
e
s
u
a
c
n
a
c
r
e
d
r
o
r
e
p
o
r
p
n
i
s
n
o
i
t
c
u
r
t
s
n
i
.
h
t
a
e
d
r
o
y
r
u
j
n
i
l
a
n
o
s
r
e
p
.
o
N
l
e
d
o
M
r
e
l
i
o
B
r
e
b
m
u
N
t
r
a
P
e
s
a
B
l
a
i
c
e
p
S
B
5
0
8
5
5
0
6
1
8
1
6
B
6
0
8
5
6
0
6
1
8
1
6
B
7
0
8
5
7
0
6
1
8
1
6
B
8
0
8
5
8
0
6
1
8
1
6
B
9
0
8
5
9
0
6
1
8
1
6
B
0
1
8
5
0
1
6
1
8
1
6
G
N
I
N
R
A
W
r
i
a
n
o
i
t
a
l
i
t
n
e
v
d
n
a
n
o
i
t
s
u
b
m
o
c
e
t
a
u
q
e
d
A
r
e
p
o
r
p
e
r
u
s
s
a
o
t
d
e
d
i
v
o
r
p
e
b
t
s
u
m
.
n
o
i
t
s
u
b
m
o
c
Summary of Contents for 805B
Page 13: ...13 Figure 8 Jacket Assembly...
Page 14: ...14 Figure 9 EP OP Control Installation...
Page 17: ...17 Figure 10 Schematic Gas Piping 24V Standing Pilot 806B 807B...
Page 18: ...18 Figure 11 Main Gas Piping Intermittent Ignition EI...
Page 19: ...19 Figure 12 Schematic Pilot Piping Honeywell EI USA...
Page 20: ...20 Figure 13 Schematic Pilot Piping Honeywell EI Canada Natural Gas 805B 810B LP Gas 806B 807B...
Page 21: ...21 Figure 14 Schematic Pilot Piping Johnson EI USA...
Page 22: ...22 Figure 15 Schematic Pilot Piping Johnson EI Canada Natural Gas 805B 810B LP Gas 806B 807B...
Page 23: ...23 Figure 16 Schematic Gas Piping OP Control System 806B 810B...
Page 24: ...24 Figure 17 Schematic Gas Piping OP CSD 1 Control System 808B 810B...
Page 25: ...25 Figure 18 Schematic Gas Piping EP Control System Natural Gas Only 806B 810B...
Page 26: ...26 Figure 19 Schematic Gas Piping EP CSD 1 Control System 808B 810B...
Page 30: ...30 Figure 25 Recommended Boiler Piping for Circulator Zoned Heating Systems...
Page 39: ...39 Figure 31 Wiring Diagram Standing Pilot 24 USA and Canada Continuous Circulation...
Page 40: ...40 Figure 32 Wiring Diagram Standing Pilot 24V USA and Canada Intermittent Circulation...
Page 42: ...42 Figure 33 Wiring Diagram OP OP CSD 1 Ignition System Continuous Circulation...
Page 43: ...43 Figure 34 Wiring Diagram OP OP CSD 1 Ignition System Intermittent Circulation...
Page 45: ...45 Figure 35 Wiring Diagram Honeywell EI USA Continuous Circulation...
Page 46: ...46 Figure 36 Wiring Diagram Honeywell EI USA Intermittent Circulation...
Page 47: ...47 Figure 37 Wiring Diagram Honeywell EI Canada Continuous Circulation...
Page 48: ...48 Figure 38 Wiring Diagram Honeywell EI Canada Intermittent Circulation...
Page 50: ...50 Figure 39 Wiring Diagram Johnson EI USA Continuous Circulation...
Page 51: ...51 Figure 40 Wiring Diagram Johnson EI USA Intermittent Circulation...
Page 52: ...52 Figure 41 Wiring diagram Johnson EI Canada Continuous Circulation...
Page 53: ...53 Figure 42 Wiring Diagram Johnson EI Canada Intermittent Circulation...
Page 55: ...55 Figure 43 Wiring Diagram EP EP CSD 1 Ignition System USA Continuous Circulation...
Page 56: ...56 Figure 44 Wiring Diagram EP EP CSD 1 Ignition System USA Intermittent Circulation...
Page 60: ...60 Figure 49 Lighting Instructions 24V Standing Pilot...
Page 61: ...61 Figure 50 Operating Instructions EI...
Page 62: ...62 Figure 51 Lighting Instructions OP...
Page 63: ...63 Figure 52 Operating Instructions EP...
Page 71: ...71 Honeywell EI Trouble Shooting Guide...
Page 72: ...72 Johnson EI Trouble Shooting Guide...
Page 73: ...73...
Page 74: ...74 SERVICE RECORD DATE SERVICE PERFORMED...
Page 94: ...94...
Page 97: ...97...