4
Putting into Service
4.1
Putting into service
4.2
Making Ready for Operation
Before initial operation, no electrical measurement is necessary for beds with a 24-volt sys-
tem, since these beds are tested for electrical safety and functionality by the manufacturer
before they leave the factory in perfect condition.
•
Allow the bed to adjust to room temperature for about 20 minutes if it was stored be-
forehand at the lowest or highest permissible temperature.
•
After the bed has been assembled, carry out a check in accordance with the chapter
.
•
Clean and disinfect the bed before it is used for the first time and before every re-use in
accordance with the chapter
Part B: Cleaning and Disinfection
•
The bed is ready for operation if all the steps described in the chapter
have been read and carried out successfully.
Before putting the bed into service each time, the user must check that:
•
The bed has been cleaned and disinfected.
•
The castors are braked.
•
The power supply is compatible with the bed (AC 230 V, 50/60 Hz, -15% - +10%).
•
The switch mode power supply is connected and the cable is routed in such a way that
it cannot be damaged.
•
The switch mode power supply, drive cables and handset cable cannot be damaged by
moving parts of the bed.
•
No obstacles such as bedside cabinets, supply rails or chairs will inhibit adjustments.
•
All adjustments function properly and have been checked (see
The bed must not be put into operation unless these checks have been carried out!
Part B: Operator and Technical Personnel
41
Summary of Contents for Regia
Page 2: ...Part A General Information ...
Page 3: ...Regia Standard care bed Regia care bed DSG optional ...
Page 6: ...II ...
Page 30: ...Part B Operator and Technical Per sonnel ...
Page 31: ...Regia Standard care bed Regia care bed DSG optional ...
Page 36: ...IV ...
Page 105: ...Appendix Part B Operator and Technical Personnel 69 ...
Page 106: ...Part C Care staff and residents ...
Page 107: ...Regia Standard care bed Regia care bed DSG optional ...
Page 151: ...Cleaning and Disinfection Part C Care staff and residents 41 ...