User Guide
76
www.bull.com
Installing and Removing the Rack Handles
Installing the Rack Handles
1.
Make sure the power switches for the computer, video monitor and any
peripheral devices are turned OFF and unplug the power cord (see
“General
Safety Information” on page 134
).
2.
If applicable, disconnect the monitor and peripheral devices (printers, for
instance) from the system.
3.
Attach the rack handle to the server system with two screws as shown in the
figure below.
Figure 36: Installing the Rack Handle
4.
Repeat step 3 on the opposite side of the server.
5.
Plug all peripheral devices and the AC power cable into the server.
Removing the Rack Handles
1.
Make sure the power switches for the computer, video monitor and any
peripheral devices are turned OFF and unplug the power cord (see
“General
Safety Information” on page 134
).
2.
If applicable, disconnect the monitor and peripheral devices (printers, for
instance) from the system.
3.
Remove the two screws holding the rack handle in place, and remove the rack
handle from the server system as shown in the figure below.
Figure 37: Removing the Rack Handle
4.
Repeat step 3 on the opposite side of the server.
5.
Plug all peripheral devices and the AC power cable into the server.
Summary of Contents for Novascale R410E1
Page 1: ...NovaScale T810 E1 T830 E1 R410 E1 User s Guide NOVASCALE REFERENCE 86 A1 15FA 02...
Page 2: ......
Page 34: ...User Guide 34 www bull com Motherboard Motherboard Layout Figure 14 Motherboard Layout...
Page 55: ...User Guide 55 www bull com SAS Hard Disk Drive Capacity 73GB minimum 15000 RPM RAID support...
Page 323: ......
Page 324: ...BULL CEDOC 357 AVENUE PATTON B P 20845 49008 ANGERS CEDEX 01 FRANCE REFERENCE 86 A1 15FA 02...