Commissioning the heating system
8
Logano GB125 oil condensing boiler - Technical specifications are subject to change without prior notice.
42
8.8
Commissioning report
B
Sign all
commissioning work as completed and enter the
date.
Commissioning work
Page
Actual values
Comments
1. Fill heating system and check all connections for leaks
__________ bar
2.
Filling the siphon with water
3. Create operating pressure
– Adjust the green field on the pressure gauge
– Vent the heating system
– Adjust the pre-charge pressure of the expansion vessel
(
observe expansion vessel documentation)
__________ bar
4. Check the combustion air supply and flue gas routing
5. Check the location of the hot gas baffle plates
6. Start up the control unit (
observe the control unit documentation)
7. Starting the burner (
8. Adjust the control unit settings to suit the customer's requirements
(
control unit documentation)
9. Provide the system user with information and hand over all relevant
technical documentation
Confirm professional commissioning
Company stamp/signature/date
USER INFORMATION
B
Inform your customer of the correct fuel
and enter it in the table (
rating instructions).