Assembling the boiler block
7
Logano G215 WS - We reserve the right to make any changes due to technical modifications.
33
Installing the front boiler cover
z
Slot the front boiler cover with its cutout onto the
upper tie-bar and push back.
z
Secure the front boiler cover to the side panels using
two self-tapping screws.
Installing the cable entry
z
Secure the cable entry to the hole in the boiler rear
panel.
Insulating the connecting block
z
Cut out the connecting block insulating shells at the
indicated and required positions.
Fig. 44 Installing the front boiler cover
USER NOTE
Installing the rear boiler cover
(
Î
Section 8.7, page 41).
Fig. 45 Installing the cable entry
Fig. 46 Cutting out the insulating shells