Assembling the boiler block
7
Logano G215 WS - We reserve the right to make any changes due to technical modifications.
34
z
Push both insulating shells onto the connecting
block.
z
Push the radiation protection onto the insulating
shells.
7.5
Positioning and levelling boiler
z
Position the boiler in its final location.
z
Level the boiler horizontally by turning the adjustable
feet and using a spirit level.
Fig. 47 Insulating the connecting block
Fig. 48 Installing the radiation protection
Fig. 49 Levelling the boiler horizontally
USER NOTE
z
Protect connectors against dirt if the
boiler is not immediately taken into use.