Assembling the boiler block
7
Logano G215 WS - We reserve the right to make any changes due to technical modifications.
30
Installing the upper tie-bar
z
Secure the upper cross bar using the nuts provided
on the threaded anchor rods.
Installing the lower tie-bar
z
Secure the lower tie-bar to the front section using
hexagon bolts.
Installing lagging
z
Place the lagging over the boiler block.
z
Push the lagging under the boiler block, in the
direction of the arrow.
z
Position the lagging tabs in front of the upper tie-bar
and draw together with a spring clip.
Fig. 36 Fitting the upper cross bar
1
Anchor rods
1
Fig. 37 Fitting the lower cross bar
Fig. 38 Installing lagging
1
Spring clip
2
Lagging tabs
2
1