52
Installation and maintenance instructions Logano G215 US oil/gas-fired boilers • Issue 11/2004
We reserve the right to make any changes due to technical modifications.
Boiler maintenance
11
11.6 Inspection and maintenance protocols
z
Sign all service work as completed and enter the
relevant date.
The service and maintenance protocols can also be
used as templates.
Service work
Page Date: ______
Date: ______
Date: ______
1.
Check the general condition of the heating system
2.
Visual and function check of the heating system
3.
Check all fuel and water components of the system for:
–
leaks during operation
–
leak test
–
visible signs of corrosion
–
signs of ageing
4.
Check the combustion chamber and the heating surface for
contamination; shut down the system for this step
48
5.
Check the burner (
Î
burner manual)
6.
Check the combustion air supply and flue gas routing for function
and safety
7.
Check the operating pressure, relief valve and expansion tank inlet
pressure
51
8.
Check the DHW tank and corrosion anode for function (
Î
DHW
tank documentation)
9.
Check the control settings (
Î
control manual)
10. Record the final checks of the inspection work, incl. measurements
and test results
Confirm service work
Company
stamp/signature
Company
stamp/signature
Company
stamp/signature