Boiler block assembly
7
29
We reserve the right to make any changes due to technical modifications.
Installation and maintenance instructions Logano G215 US oil/gas-fired boilers • Issue 11/2004
z
Secure the boiler back panel with nuts to the
threaded and spacer pins.
Installation of the top tie-bar
z
Secure the top tie-bar with the nuts supplied to the
anchor rod threads.
Fitting the bottom tie-bar
z
Screw the bottom cross bar with hexagon bolts to the
front section.
Fig. 34
Installation of the boiler back panel
Fig. 35
Fitting the top tie-bar
1
Anchor rods
1
Fig. 36
Fitting the bottom cross bar