54
Installation and maintenance instructions Logano G215 US oil/gas-fired boilers • Issue 11/2004
We reserve the right to make any changes due to technical modifications.
Boiler maintenance
11
On-demand maintenance procedures
Page Date: ______
Date: ______
Date: ______
1.
Shut down the heating system
47
2.
Remove and clean the flue baffles
49
3.
Clean the (heating surfaces) and combustion chamber, then re-
install the flue baffle plates in their original position.
49
4.
Check and, if required, replace gaskets/sealing rope on the burner
door and burner
50
5.
Start up the heating system
43
6.
Carry out final check of the maintenance work
7.
Check the function and safety in operation
Confirm professional maintenance
Company
stamp/signature
Company
stamp/signature
Company
stamp/signature
Date: ______
Date: ______
Date: ______
Date: ______
Date: ______
Date: ______
Date: ______
1.
2.
3.
4.
5.
6.
7.
Company
stamp/signature
Company
stamp/signature
Company
stamp/signature
Company
stamp/signature
Company
stamp/signature
Company
stamp/signature
Company
stamp/signature