Boiler installation
8
33
We reserve the right to make any changes due to technical modifications.
Installation and maintenance instructions Logano G215 US oil/gas-fired boilers • Issue 11/2004
8
Boiler installation
This chapter details how to install your boiler correctly.
These details include:
–
Flue connection
–
Water connections
–
Electrical connection
–
Burner installation (field installation)
–
Fuel connection
8.1
Flue connection
8.1.1 Chimney venting
Connect boiler to vertical chimney with a 6" vent pipe.
Use only venting systems that comply with local codes
and regulations. If local codes are not available, refer the
the following regulations:
–
NFPA 31, Installation of Oil-Burning Equipment,
–
NFPA 211, Standard for Chimneys, Fire Places and
Solid Fuel Burning Appliances,
–
In Canada refer to CSA B139, Installation Code for
Oil-Burning Equipment,
–
NFPA 211 requires chimney to be lined before
connecting boiler.
Inspecting and cleaning existing flue
Inspect and clean the old flue before installation of the
new boiler.
z
Remove blockages and dirt from the chimney.
z
Clean chimney
z
Repair or replace faulty flues.
z
If necessary, repair chimney with mortar and joints.
Down drafts
Minimum clearances to combustible objects
NOTICE
To prevent down drafts extend chimney at
least 3 feet above the roof opening at least
2 feet above any part of the roof within a
radius of 10 feet.
Flue pipe
Type
Minimum
clearance
Double-wall
L
6"
Single-wall
L
18"
Tab. 13 Minimum clearances to combustible objects for flue
systems