Büchi Labortechnik AG
Operating top-mount drying racks | 8
Operation Manual Lyovapor™ L-200/L-200 Pro
77/100
u
Loosen all fixing screws.
u
Align the slots for the shelves.
u
Tighten the fixing screws.
u
Place the rack on the intermediate plate.
u
Slide the shelves into the rack.